Refine Your Search

Search Results

Viewing 1 to 2 of 2
Technical Paper

Mars Exploration Rover Surface Mission Flight Thermal Performance

2005-07-11
2005-01-2827
NASA launched two rovers in June and July of 2003 as a part of the Mars Exploration Rover (MER) project. MER-A (Spirit) landed on Mars in Gusev Crater at 15 degrees South latitude and 175 degrees East longitude on January 4, 2004 (Squyres, et al., Dec. 2004). MER-B (Opportunity) landed on Mars in Terra Meridiani at 2 degrees South latitude and 354 degrees East longitude on January 25, 2004 (Squyres, et al., Aug. 2004). Both rovers have well exceeded their design lifetime (90 Sols) by more than a factor of 5. Spirit and Opportunity are still healthy and continue to execute their roving science missions at the time of this writing. This paper discusses rover flight thermal performance during the surface missions of both vehicles, covering roughly the time from the MER-A landing in late Southern Summer (aereocentric longitude, Ls = 328, Sol 1A) through the Southern Winter solstice (Ls = 90, Sol 255A) to nearly Southern Vernal equinox (Ls = 160, Sol 398A).
Technical Paper

Mars Rover 2003 Battery Charger

1999-08-02
1999-01-2447
The Jet Propulsion Laboratory Mars Exploration Program Office is currently planning a series of exciting missions to the Red Planet. During each launch opportunity, the missions to Mars will include a Rover mission. During the earlier Rover missions to Mars such as the Mars Pathfinder mission carrying the Sojourner Rover in 1997, the main rover power source was a solar array. The power subsystem of the Sojourner Rover included a solar panel for power during the day, a non-rechargeable lithium battery for power during the night, and a power electronics board for power conditioning and distribution. Starting with the year 2003 the rover missions to Mars will incorporate a rechargeable energy storage device rather than a non-rechargeable power source. Included in the power electronics board, will be a battery controller/charger. The battery controller/charger will be able to monitor and control three parallel 4-cell battery strings.
X