Refine Your Search

Search Results

Viewing 1 to 4 of 4
Standard

TEST CELL INSTRUMENTATION

1996-11-01
HISTORICAL
AIR5026
This document discusses, in broad general terms, typical present instrumentation practice for post-overhaul gas turbine engine testing. Production engine testing and engine development work are outside the scope of this document; they will use many more channels of instrumentation, and in most cases will have requirements for measurements that are never made in post-overhaul testing, such as fan airflow measurements, or strain measurements on compressor blades. The specifications for each parameter to be measured, in terms of measurement range and measurement accuracy, are established by the engine manufacturers. Each test cell instrument system should meet or exceed those requirements. Furthermore, each instrument system should be recalibrated regularly, to ensure that it is still performing correctly.
Standard

Configuration Control for Maintaining Correlation of Gas Turbine Engine Test Cells

2022-10-05
WIP
ARP6028B
The FAA has issued Advisory Circular, AC43-207, that recommends re-correlation, trending or period checks. The FAA, AC43-207 bases their recommendation on ARP741. This paper describes a recommended practice and procedure for the configuration control requirements to maintain test cell correlation status. This is necessary to maintain performance measurement integrity, particularly when correlation approval is achieved by statistical trending. The configuration of a test facility that exists at the time when a correlation is being carried out should be "base lined" as a condition of correlation approval acceptance, and, be maintained during the time period that the respective correlation approval lasts. This defines test facility configuration control. This is due to the fact that a change in configuration may have the potential to change the established correlation factors and measured engine performance.
Standard

Configuration Control for Maintaining Correlation of Gas Turbine Engine Test Cells

2020-10-21
CURRENT
ARP6028A
The FAA has issued Advisory Circular, AC43-207, that recommends re-correlation, trending or period checks. The FAA, AC43-207 bases their recommendation on ARP741. This paper describes a recommended practice and procedure for the configuration control requirements to maintain test cell correlation status. This is necessary to maintain performance measurement integrity, particularly when correlation approval is achieved by statistical trending. The configuration of a test facility that exists at the time when a correlation is being carried out should be "base lined" as a condition of correlation approval acceptance, and, be maintained during the time period that the respective correlation approval lasts. This defines test facility configuration control. This is due to the fact that a change in configuration may have the potential to change the established correlation factors and measured engine performance.
Standard

Configuration Control for Maintaining Correlation of Gas Turbine Engine Test Cells

2009-03-13
HISTORICAL
ARP6028
The configuration of a test facility that exists at the time when a correlation is being carried out should be “base lined” as a condition of correlation approval acceptance, and, be maintained during the time period that the respective correlation approval lasts. This defines test facility configuration control. This is due to the fact that a change in configuration may have the potential to change the established correlation factors and measured engine performance. If such a change occurs then this should be judged by the respective OEM’s or designated correlation approval authorities Subject Matter Expert (SME). In some cases, this may involve consultation with the engine project customer or airworthiness authorities.
X