Refine Your Search

Search Results

Viewing 1 to 8 of 8
Standard

Crane Hoist Line Speed and Power Test Procedure

2022-10-26
WIP
J820
This document applies primarily to mobile cranes that lift loads by means of a drum and hoist line mechanism. It can be used to determine the hoist line speed and power of other hoist line mechanisms, if the load can be held constant and hoist line travel distance is sufficient for the accuracy of the line speed measurements prescribed. This recommended practice applies to all mechanical, hydraulic, and electric powered hoist mechanisms.
Standard

Cantilevered Boom Crane Structures - Method of Test

2019-09-24
WIP
J1063
This SAE Standard applies to mobile, construction-type lifting cranes of the cantilever boom type (Figure 1). Questions and comments regarding application or interpretation of the provisions in this test method should be referred to the originating SAE Committee.
Standard

Crane and Cable Excavator Basic Operating Control Arrangements

2016-12-07
WIP
J983
This SAE Recommended Practice applies to mobile, construction type, crane and cable excavator hand and foot controls. It should not be construed to limit the use of, or to apply to combination controls, automatic controls, or any other special operating control requirements.
Standard

Cranes--Access and Egress

2022-10-19
WIP
J2703
This recommended practice specifies criteria for steps, stairways, ladders, walkways, platforms, handrails, handholds, guardrails and entrance openings which permit access to and from operator, inspection or maintenance platforms on mobile cranes parked in accordance with the manufacturer's instruction. It also presents requirements for guards and restraints as related to moving parts.
Standard

Rated Capacity Systems

2012-03-06
WIP
J159
This SAE Standard applies to cranes when used in lifting service that are equipped with Rated Capacity Systems. Purpose The purpose of this document is to establish the minimum performance and tolerance criteria of systems used to warn or to indicate to the operator and/or other responsible persons when the load being lifted approaches, meets and exceeds the rated capacity on the applicable rated capacity chart of the crane.
X