Standard

Installed Outdoor Engine Testing

2007-11-15
HISTORICAL
AIR5301
This SAE Aerospace Information Report (AIR) was written because of the growing interest in aircraft installed outdoor engine testing by the Federal Aviation Administration, airlines, charter/commercial operators, cargo carriers, engine manufacturers and overhaul and repair stations. This document was developed by a broad cross section of personnel from the aviation industry and government agencies and includes information obtained from a survey of a variety of operators of fixed and rotary wing aircraft and research of aircraft and engine maintenance manuals.
Standard

Installed Outdoor Engine Testing

2017-11-29
HISTORICAL
AIR5301A
This SAE Aerospace Information Report (AIR) was written because of the growing interest in aircraft installed outdoor engine testing by the Federal Aviation Administration, airlines, charter/commercial operators, cargo carriers, engine manufacturers and overhaul and repair stations. This document was developed by a broad cross section of personnel from the aviation industry and government agencies and includes information obtained from a survey of a variety of operators of fixed and rotary wing aircraft and research of aircraft and engine maintenance manuals.
Standard

Trend Analysis for Maintaining Correlation of Gas Turbine Engine Test Cells

2011-03-10
HISTORICAL
ARP5758
This document describes a recommended practice and procedure for the trending of parameters to maintain the test cell correlation status. Trending is performed to monitor test cells for changes that can affect engine performance or the data acquired from engine tests.
Standard

Test Facility Shakedown and Commissioning

2017-11-29
CURRENT
AIR6364
The paper discusses in general terms the activities required to be undertaken or demonstrated during the establishment of the facility such as: the assessment checks prior to forwarding to the end users site for embodiment into the facility system the establishment of the facility such as trial installations of hardware, functionality checking of lifting transportation and access systems, centerline pull checks, pressure testing of fuel and air start systems, flushing of wet systems and electrical continuity checking. the commissioning of the facility such as instrumentation calibrations, engine starts, engine running, assessment of command and control system, assessment of DAS system, aerodynamic and acoustic surveys. The paper will concentrate on the main engineering engine related aspects of the facility and will not necessarily contain information on the construction validation activities such as HVAC, electrical, facility fire system, waste water etc.