Automation for the Assembly of the Bottom Wing Panels on Stringers for the A320
Document Number: 2006-01-3143
Date Published: September 2006
Author(s):
Philippe Prat - Alema Automation
Abstract:
The paper details the two main phases of the research and development process which led to the current state on the stage 0 dedicated to the assembly of the A320 bottom panel on stringers and buttstraps. First phase: evaluation of the feasibility through trials on platform with a serial KUKA robot, evidence to achieve correctly 3/8\mi diameter and evidence of the difficulties to achieve the performances for the positioning accuracy. Second phase: development of specific solution on calibration and end effector, implementation on site, definitive performance proved during production.
File Size: 841K
Product Status: In Stock
See other papers presented at Aerospace Manufacturing and Automated Fastening Conference and Exhibition, September 2006, Toulouse, FRANC, Session: Robotic and Portable Drilling and Fastening Systems Part 2 of 2
Purchase more technical papers and save! With TechSelect,
you decide what SAE Technical Papers you need, when you need them, and how much you want to pay.
Learn more >
|