Wing Manufacturing: Next Generation

Document Number: 985601

Date Published: July 1998

Author(s):
John L. Hartmann - Electroimpact Inc.
Peter B. Zieve - Electroimpact Inc.

Abstract:
Due to the part size and technological limitations of the available assembly equipment, traditional wing manufacturing has consisted of a three-stage process. Parts are first manually tacked together in an assembly jig. They are then removed from the jig, rotated horizontally and craned into an automated fastening machine. Finally, they are removed from the fastening machines and craned to a third station where the manual tacks are removed and the parts are prepped for final wing box assembly.

With the advent of electromagnetic riveting (EMR) and the traveling yoke assembly machine this traditional approach has been replaced with single station processing. Wing panels and spars can now be automatically tacked together under continuous clamp up in their assembly jigs using EMR. This eliminates the requirement for disassembly, debur and cleaning required with the manual process. While the wing panels and spars remain rigidly held in their flying configuration by the assembly jig they are fastened with an articulated yoke. Tool tables are mounted to the bottom of a solid yoke to insure opposing head alignment. Assembly jigs are lined end to end to allow one machine to service multiple stations and further enhance productivity.

In addition to efficiency improvements, this new process improved product quality. The elimination of multiple crane moves and the manual tracking process greatly reduces the potential in process damage to the components. Since the parts are held rigidly in their assembly jigs during the entire fastening process, final panel and spar definitions are improved. Further, the use of EMR riveting has been demonstrated to provide superior fatigue to conventional process.

Two recent case studies of this approach are presented. The E4000 assembly system went into production on the A320 program in early 1998. The E5000 spar assembly system, ASAT4, goes into production in mid 1998.

These two systems are evolutions of earlier systems introduced on the Airbus A340 and Boeing 767 programs, respectively. These two systems include a number of new enhancements over past systems and demonstrate approaches to both high and low rate aircraft production.

File Size: 965K
Product Status: In Stock

See other papers presented at SAE 2000 World Congress, March 2000, Detroit, MI, USA, Session: Challenges in Today's Automated Fastening Systems

Purchase more technical papers and save! With TechSelect, you decide what SAE Technical Papers you need, when you need them, and how much you want to pay. Learn more >

Members Receive 20% Discount at Checkout on Items Under $500

Delivery Method List Price Member Price Add to Cart
Download
(Protected by DRM Security)
$15.00 $12.00 Add to Cart
Mail $15.00 $12.00 Add to Cart
Fax $30.00 $24.00 Add to Cart

Information on:    Download   |   Mail/Post   |   Fax   |   DRM Security

Learn more about the Digital Rights Management Security available on all downloaded pdf documents.

ARi SAE Foundation PRI SAE Institute - An affiliate of SAE International SAE Brasil SAE India SAE UK - A Section of SAE International A World In Motion