Browse Publications Technical Papers 1999-01-2484
1999-08-02

Power System Performance of the SOHO Spacecraft During the 1998 Attitude Recovery 1999-01-2484

This paper will highlight the electrical power system topology and basic performance of the SOHO mission during the first two years of its operation. It will go on to relate the chronology of spacecraft and power system events that occurred from the initial loss of SOHO contact in June 1998, up until the time of its attitude recovery some three months later. It will describe the operational modes of the power system during this critical period and the fundamental lessons learnt, which could enhance recovery prospects in the event that other missions experience a similar anomaly.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 43% off list price.
Login to see discount.
Special Offer: Purchase more aerospace standards and aerospace material specifications and save! AeroPaks off a customized subscription plan that lets you pay for just the documents that you need, when you need them.
X