Browse Publications Technical Papers 2001-01-0337
2001-03-05

Six Sigma Programs Yields Dramatic Improvement Through Applications of Lean Manufacturing Methods in the Printed Circuit Board Industry 2001-01-0337

The GE Operations Services and Solectron Corporation Six Sigma Program improved printed circuit board (PCB) throughput, response time, and capacity through the use of Lean Manufacturing concepts and the application of Lean Manufacturing techniques. This paper illustrates how Lean Manufacturing and Six Sigma complement each other for maximum benefit.
The issues confronting the PCB industry include capacity and responsiveness to customer delivery demands. Rigorous Six Sigma Methods of Measurement and Analysis pointed towards Lean Manufacturing solutions. Lines were unbalanced, WIP clogged the flow and used valuable space, material flow interfered with operations, and non-value added (NVA) time exceeded 95% in some cases. Graphical techniques and time studies pointed toward sensible flow, reduction of bottlenecks and proper allocation of space and human resources.
The resulting improvement allowed for 142% capacity increase and 47% cycle time reduction. Defects were reduced by 93%. Additional revenue significantly increased customer satisfaction.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 18% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

A System for Making Probability-Based Estimates of 6 Sigma Project Savings

2004-01-1754

View Details

TECHNICAL PAPER

Desert Research and Technology Study 2004 Field Trip Report: EVA System Results

2005-01-3015

View Details

TECHNICAL PAPER

Opportunities and Hindrances to Collaborative Automotive Development

2006-01-1469

View Details

X