Browse Publications Technical Papers 2001-01-2565
2001-09-10

Automated Drilling Systems of ARIANE 5 Structures 2001-01-2565

Two Automated Drilling Systems used in the manufacturing process of ARIANE 5 structures are described.
One of them is a NC system where a specially designed machine runs around the two assembly tools of the Equipment Bay. The other one is a tailor made pneumatic system that also runs around the assembly tool of and Inter-Stage Structure.
In both systems, conclusions about the use of those drilling units will be exposed. Finally, an automatic riveting unit will be introduced. This unit is nowadays in a development stage and will be integrated in both related systems.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 43% off list price.
Login to see discount.
Special Offer: With TechSelect, you decide what SAE Technical Papers you need, when you need them, and how much you want to pay.
X