Browse Publications Technical Papers 2003-01-2484
2003-07-07

Biomass Production System Hardware Performance 2003-01-2484

The Biomass Production System, recently flown on the ISS for 73 days, demonstrated significant advancements in functional performance over previous systems for conducting plant science in microgravity. The Biomass Production System (BPS) was the first flight of a system with multiple, independently controlled, plant growth chambers. Each of four chambers was controlled separately with respect to temperature, humidity, light level, nutrient level, and CO2, and all were housed in a double Middeck locker-sized payload. During the mission, each of the subsystems performed within specification. This paper focuses on how the performance of the BPS hardware allowed successful completion of the preflight objectives.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
X