Manufacturing was spending several hours per day reworking assemblies riveted on conventional riveters. Exit burrs were formed around the driven rivet butt (Figure 1) that had to be removed in order to accept the assembly prior to moving to the next station.
We Start with “Lean Engineering” in the Design of New Drill/Install Fastener end Effector which then Leads us to “Lean Manufacturing” on the Factory Floor