Control of Engineering Costs and Contract Definition 670832

Negotiated price of a defense contract indicates the quality/risk level at which engineering must perform. This article describes a method for controlling engineering to the proper quality to insure a profit. It includes a discussion of engineering task breakdown, task cost estimating, scheduling, and status reporting.