Construction Simulation of the Main Earth Dam at Manicouagan 3 700566

This paper describes the computer model developed to simulate construction of the eleven million cu yd gravel dam at Manic 3, and outlines the results obtained. Construction of the dam is a complex task influenced by many random events.Manic 3 is part of Hydro-Quebec's Manicouagan-Outardes hydroelectric development, which will ultimately comprise seven power stations with a combined capacity of 5.5 million kW.Before simulation was introduced, it was extremely difficult to solve the many problems involved in choosing and utilizing equipment, obtaining accurate time and cost estimates, and formulating realistic production schedules.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 43% off list price.
Login to see discount.
Special Offer: Purchase more aerospace standards and aerospace material specifications and save! AeroPaks off a customized subscription plan that lets you pay for just the documents that you need, when you need them.
X