1970-02-01

Airborne Electronic Equipment Guarantees 700636

A study of Airborne Electronic Equipment Guarantees concentrated in five (5) complementary areas: 1) Evaluation of Current Guarantee Practices, 2) Guarantee Plan Application considerations, 3) Development of Guarantee Plan Procurement Packages, 4) Guarantee Plan Cost Models and Related Procedures, and 5) Guarantee Plan Implementation Requirements.Study results indicated that sealed, Air Force depot/supplier repairable, high dollar value, low MTBF units were most amenable to Air Force avionic guarantee applications. Of the three types of guarantee plans analyzed, the full life approach was considered currently feasible for the Air Force to implement. The most difficult implementation area was considered to involve the maximum failure rate guarantee plan where operating time, as well as failure responsibility, become important criteria. The failure free guarantee, although currently feasible to implement, was not considered cost effective for avionic equipments. Conversely, both the full life and maximum failure rate approaches appeared cost effective in terms of potential savings to the Air Force. Specific savings or losses are dependent on actual MTBF's, repair times, repair costs, and bid variables.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 43% off list price.
Login to see discount.
Special Offer: Purchase more aerospace standards and aerospace material specifications and save! AeroPaks off a customized subscription plan that lets you pay for just the documents that you need, when you need them.
X