SMC Heavy Duty Truck Hood; 12 Months From Concept to Production 881860

Simultaneous engineering techniques have been applied to a SMC truck hood to reduce the lead-time for production introduction from 22 months to 12 months. Several other technologies were also applied to insure a successful product introduction in this reduced timeframe: computer definition of the hood surface for accuracy, RTM prototype tooling for early design tryout and durability testing, Finite Element Analysis to further confirm durability of the hood structure, and brittle lacquer combined with strain gaging to provide life data using a hydraulic road simulator for load inputs.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 43% off list price.
Login to see discount.
Special Offer: Purchase more aerospace standards and aerospace material specifications and save! AeroPaks off a customized subscription plan that lets you pay for just the documents that you need, when you need them.
X