1994-04-01

Initial Testing of a 250 KW Starter/Generator for Aircraft Applications 941160

The work reported in this paper has been conducted by a team from GE-Aircraft Engines, GE-CR&D, and Sundstrand under a contract sponsored by the USAF, Wright Laboratories, WPAFB, Contract No. F33615-90-C-2052. The objective of this contract is to prove the feasibility of an Integral Starter/Generator (IS/G) through the preliminary design stage and demonstrate the starter/ generator technology in the externally mounted version utilizing switched reluctance machine technology. This paper will report on the progress for the EIS/G-system through the initial testing stage. Comparison of the finished hardware with the design results presented earlier will lead of the paper. This is followed by the discussion of the early testing results for the system testing. Recommendation on additional testing will be presented at the end of the paper.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 43% off list price.
Login to see discount.
Special Offer: With TechSelect, you decide what SAE Technical Papers you need, when you need them, and how much you want to pay.
X