1994-04-01

Initial Testing of a 250 KW Starter/Generator for Aircraft Applications 941160

The work reported in this paper has been conducted by a team from GE-Aircraft Engines, GE-CR&D, and Sundstrand under a contract sponsored by the USAF, Wright Laboratories, WPAFB, Contract No. F33615-90-C-2052. The objective of this contract is to prove the feasibility of an Integral Starter/Generator (IS/G) through the preliminary design stage and demonstrate the starter/ generator technology in the externally mounted version utilizing switched reluctance machine technology. This paper will report on the progress for the EIS/G-system through the initial testing stage. Comparison of the finished hardware with the design results presented earlier will lead of the paper. This is followed by the discussion of the early testing results for the system testing. Recommendation on additional testing will be presented at the end of the paper.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

A Detailed Power Inverter Design for a 250 kW Switched Reluctance Aircraft Engine Starter/Generator

931388

View Details

TECHNICAL PAPER

Dynamic Testing of a High Power Inverter 250 KW Switched Reluctance Machine Starter/Generator

941162

View Details

TECHNICAL PAPER

Switched Reluctance Starter/Generator System Modeling Results

951407

View Details

X