Refine Your Search

Search Results

Viewing 1 to 10 of 10
Technical Paper

International Space Station Environmental Control and Life Support Emergency Response Verification for Node 1

2008-06-29
2008-01-2136
The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 Emergency Response capability, which includes nominal and off-nominal FDS operation, off-nominal ACS operation, and off-nominal THC operation. These subsystems provide the capability to help aid the crew members during an emergency cabin depressurization, a toxic spill, or a fire. The paper will also provide a discussion of the detailed Node 1 ECLS Element Verification methodologies for operation of the Node 1 Emergency Response hardware utilized during the Node 1 Element Qualification phase.
Technical Paper

International Space Station Temperature and Humidity Control Subsystem Verification for Node 1

2007-07-09
2007-01-3185
The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the nominal operation of the Node 1 THC subsystem design. The paper will also provide a discussion of the detailed Element Verification methodologies for nominal operation of the Node 1 THC subsystem operations utilized during the Qualification phase.
Technical Paper

International Space Station Atmosphere Control and Supply, Atmosphere Revitalization, and Water Recovery and Management Subsystem - Verification for Node 1

2007-07-09
2007-01-3102
The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the nominal operation of the Node 1 ACS, AR, and WRM design and detailed Element Verification methodologies utilized during the Qualification phase for Node 1.
Technical Paper

International Space Station (ISS) Water Transfer Hardware Logistics

2006-07-17
2006-01-2093
Water transferred from the Space Shuttle to the International Space Station (ISS) is generated as a by-product from the Shuttle fuel cells, and is generally preferred over the Progress which has to launch water from the ground. However, launch mass and volume are still required for the transfer and storage hardware. Some of these up-mass requirements have been reduced since ISS assembly began due to changes in the storage hardware (CWC). This paper analyzes the launch mass and volume required to transfer water from the Shuttle and analyzes the up-mass savings due to modifications in the CWC. Suggestions for improving the launch mass and volume are also provided.
Technical Paper

A Review of Monitoring Technologies for Trace Air Contaminants in the International Space Station

2004-07-19
2004-01-2339
NASA issued a Request For Information (RFI) to identify technologies that might be available to monitor a list of air pollutants in the ISS atmosphere. After NASA received responses to the RFI, an expert panel was assembled to hear presentations from 9 technology proponents. The goal of the panel was to identify technologies that might be suitable for replacement of the current Volatile Organics Analyzer (VOA) within several years. The panelists consisted of 8 experts in analytical chemistry without any links to NASA and 7 people with specific expertise because of their roles in NASA programs. Each technology was scored using a tool that enabled rating of many specific aspects of the technology on a 4-point system. The maturity of the technologies ranged from well-tested instrument packages that had been designed for space applications and were nearly ready for flight to technologies that were untested and speculative in nature.
Technical Paper

International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System Keep Out Zone On-Orbit Problems

2004-07-19
2004-01-2387
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system performance can be impacted by operations on ISS. This is especially important for the Temperature and Humidity Control (THC) and for the Fire Detection and Suppression (FDS) subsystems. It is also more important for Node 1 since it has become a convenient area for many crew tasks and for stowing hardware prior to Shuttle arrival. This paper will discuss the current requirements for ECLS keep out zones in Node 1; the issues with stowage in Node 1 during Increment 7 and how they impacted the keep out zone requirements; and the solution during Increment 7 and 8 for maintaining the keep out zones in Node 1.
Technical Paper

Updating the Tools Used to Estimate Space Radiation Exposures for Operations: Codes, Models, and Interfaces

2002-07-15
2002-01-2457
In order to estimate the exposure to a crew in space, there are three essential steps to be performed: first, the ambient radiation environment at the vehicle must be characterized; second, the mass distribution properties of the vehicle, including the crewmembers themselves must be developed, and third a model of the interactions of space radiations with matter must be employed in order to characterize the radiation field at the dose point of interest. The Space Radiation Analysis Group (SRAG) at the NASA, Johnson Space Center carries the primary responsibility for the operational radiation protection support function associated with manned space flight. In order to provide support during the various planning, execution, and analysis/recording phase activities associated with a given mission, tools have been developed to allow rapid, repeatable calculations of exposure on orbit.
Technical Paper

Space Shuttle Launch Entry Suit Thermal Performance Evaluation

1993-07-01
932297
Comments of the Space Shuttle crew indicate that the Launch Entry Suit (LES) may provide inadequate cooling before launch and after reentry. During these periods some crewmembers experienced thermal discomfort induced by localized cabin heating, middeck experiments, and crewmembers' body heat and humidity. The NASA Johnson Space Center(JSC) Crew and Thermal System Division (CTSD) executed a two phase study, analysis and testing, to investigate this problem. The analysis phase used a computer model of the LES to study the transient heat dissipation and temperature response under the various Space Shuttle flight cabin environments. After the completion of the analysis, the testing phase was conducted to collect the engineering data in order to validate the analysis results. Due to the constraint of the test facility, the test was conducted on the air cooled techniques only. This paper presents the analytical model, its solution and an evaluation and summary of the test results.
Technical Paper

Reduced Gravity and Ground Testing of a Two-Phase Thermal Management System for Large Spacecraft

1988-07-01
881084
An experiment was performed to observe flow regimes and measure pressure drops of two-phase (liquid/vapor) flow and condensation in reduced gravity. Testing was conducted aboard the NASA-JSC KC-135 reduced gravity aircraft using a prototype two-phase thermal management system for large spacecraft. A clear section of two-phase line enabled visual and photographic observation of the flow regimes. The two-phase mixture was generated by pumping nearly saturated liquid refrigerant 114 through an evaporator and adding heat through electric heaters. The resultant two-phase flow was varied by changing the evaporator heat load, creating qualities from 0.05 to 0.80. Visual and photographic observation of vapor condensation was also made through a clear cover on the system condenser. During the flight tests, the experiment hardware was exposed to gravitational acceleration ranging from near-zero to 1.8 g's.
X