Refine Your Search

Search Results

Viewing 1 to 3 of 3
Technical Paper

More Efficient Combustion in Small Open Chamber Diesel Engines

1972-02-01
720775
Until quite recently, it appeared that there was an effective lower limit on bore size in open-chamber diesel engines. This paper presents a technique for improving combustion in the small open-chamber diesel engine. Recent work at MIT on a 2-1/2 in bore, short-stroke diesel engine has demonstrated that good efficiency can be obtained through a combination of a large-hole nozzle and the use of air swirl to prevent overpenetration. There is some indication that good efficiency can be obtained over a wider operating range than standard diesel practice. A method of design analysis for this type of engine is presented, along with techniques for estimating the swirl and nozzle design parameters.
Technical Paper

LOOP SCAVENGING versus THROUGH SCAVENGING of TWO-STROKE ENGINES

1958-01-01
580044
THIS paper reports the latest investigation of the relative merits of loop scavenging versus through scavenging. The authors hope that the conditions of the work permitted an objective evaluation of the two types of engines. The results of the study may be summarized as follows: 1. With symmetrical timing, neither cylinder shows significant advantage in trapping efficiency. 2. With symmetrical timing, the best ratio of exhaust-port to inlet-port effective area seems to be about 0.6. 3. Unsymmetrical timing is an effective method of improving trapping efficiency. 4. The value of net indicated fuel economy shows no significant difference between the two cylinders. The authors point out that because the areas were equal it is unlikely that the optimum port design of each type was used in comparing the cylinders. If optimum porting had been used, the two types might have shown more difference.
Technical Paper

Scavenging the 2-Stroke Engine

1954-01-01
540258
THE indicated output of a 2-stroke engine is primarily dependent upon the success with which the products of combustion are driven from the cylinder and are replaced by fresh air or mixture during the scavenging period. Such replacement must, of course, be accomplished with a minimum of blower power. This paper deals with various aspects of 2-stroke research conducted at M.I.T. during the past 10 years. Among the subjects discussed are the methods used in the prediction and measurement of scavenging efficiency, and the effect of engine design and operating variables on the scavenging blower requirements as reflected by the scavenging ratio.
X