Refine Your Search

Search Results

Viewing 1 to 7 of 7
Standard

APU Gas Turbine Engine Test Cell Correlation

2007-12-19
HISTORICAL
ARP5435
This paper describes a recommended practice and procedure for the correlation of test cells that are used for the performance testing of APU (auxiliary power unit) engines. Test cell correlation is performed to determine the effect of any given test cell enclosure and equipment on the performance of an engine relative to the baseline performance of that engine. The baseline performance is generally determined at the OEM designated test facility.
Standard

Turboshaft/Turboprop Gas Turbine Engine Test Cell Correlation

2007-11-15
HISTORICAL
ARP4755A
This paper describes a recommended practice and procedure for the correlation of test cells that are used for the performance testing of turboprop and turboshaft engines. This Aerospace Recommended Practice (ARP) shall apply to both dynamometer and propeller based testing. Test cell correlation is performed to determine the effect of any given test cell enclosure and equipment on the performance of an engine relative to the baseline performance of that engine.
Standard

Configuration Control for Maintaining Correlation of Gas Turbine Engine Test Cells

2009-03-13
HISTORICAL
ARP6028
The configuration of a test facility that exists at the time when a correlation is being carried out should be “base lined” as a condition of correlation approval acceptance, and, be maintained during the time period that the respective correlation approval lasts. This defines test facility configuration control. This is due to the fact that a change in configuration may have the potential to change the established correlation factors and measured engine performance. If such a change occurs then this should be judged by the respective OEM’s or designated correlation approval authorities Subject Matter Expert (SME). In some cases, this may involve consultation with the engine project customer or airworthiness authorities.
Standard

Gas Turbine Engine Test Facility Audit Process

2018-01-04
CURRENT
ARP6196
This SAE Aerospace Recommended Practice provides recommendations for: the audit process in general; a list of specific areas of attention to be audited; maintaining the test facility in such a manner that it meets audit requirements.
Standard

GAS TURBINE ENGINE FUEL NOZZLE TEST PROCEDURES

2007-11-15
HISTORICAL
ARP4865
The intent of this SAE Aerospace Recommended Practice (ARP) is to define and recommend to the Aerospace Industry standardized test procedures for establishing fuel nozzle operating performance including types of tests, controlled and measured parameters, and test configurations.
Standard

Gas Turbine Engine Fuel Nozzle Test Procedures

2013-12-10
CURRENT
ARP4865A
The intent of this SAE Aerospace Recommended Practice (ARP) is to define and recommend to the Aerospace Industry standardized test procedures for establishing fuel nozzle operating performance including types of tests, controlled and measured parameters, and test configurations.
X