Refine Your Search

Search Results

Viewing 1 to 7 of 7
Technical Paper

Robotic Drilling System for 737 Aileron

2007-09-17
2007-01-3821
Boeing's wholly owned subsidiary in Australia, Hawker de Havilland produces all ailerons for the Boeing 737 family of aircraft. Increasing production rates required to meet market demand drove the requirements for a new updated approach to assembly of these parts. Using lean principals, a pulsed flow line approach was developed. A component of this new line is the integration of a flexible robotic drilling/trimming system. The new robotic system is required to meet aggressive tack time targets with high levels of reliability. The selected system was built on a Kuka KR360-2 conventional articulated arm robot. A significant challenge of this project was the requirement for the process head to work efficiently on an aileron in an existing jig. As a result a new side-mounted drill and trim end effector was developed. Automated tool changers for both cutters and pressure foot assemblies eliminated the requirement for in- process manual intervention.
Technical Paper

ASAT4-Enhanced Flexibility for the C-17

1998-09-15
982126
The Automated Spar Assembly Tool or ASAT was originally developed for the Boeing 767 wing spar in the late 1970s. Since then this powerful concept has been further advanced and integrated into nearly all the current Boeing commercial wing lines. A fourth generation system, ASAT4, has been developed for the Boeing C-17 Globemaster III. ASAT4 provides an unprecedented level of flexibility in a minimum amount of floor space. Similar to ASAT3, ASAT4 consists of a vertical traveling yoke machine which straddles the spar fixtures. Two fixtures placed end to end form a system approximately 220 feet in length which is serviced by a single machine. This allows manual operations, e.g. load and unload, to be performed on one spar while the machine works in the adjacent cell. Each fixture can accept any of the six C-17 spars. Fixture reconfiguration between spars is completely automatic. The single three axis yoke machine, the E5000, travels the full system length.
Technical Paper

Automated Wing Drilling System for the A380-GRAWDE

2003-09-08
2003-01-2940
On Airbus aircraft, the undercarriage reinforcing is attached through the lower wing skin using bolts up to 1-inch in diameter through as much as a 4-inch stack up. This operation typically takes place in the wing box assembly jigs. Manual hole drilling for these bolts has traditionally required massive drill templates and large positive feed drill motors. In spite of these large tools, the holes must be drilled in multiple steps to reduce the thrust loads, which adds process time. For the new A380, Airbus UK wanted to explore a more efficient method of drilling these large diameter holes. Introducing automated drilling equipment, which is capable of drilling these holes and still allows for the required manual access within the wing box assembly jig, was a significant challenge. To remain cost effective, the equipment must be flexible and mobile, a llowing it to be used on multiple assemblies.
Technical Paper

Automatic Stringer Drilling System

1994-10-01
941832
Northrop Corporation manufactures body panels for the Boeing 747 aircraft. There are 1259 different stringer configurations used on the three 747 models with an average of 839 stringers per ship set. Until recently, all drain holes and skin coordination pilot holes were drilled manually using plastic application template tools (PATTS). Inventory costs were high and manual drilling errors led to excessive scrap and rework rates. Northrop engineers recognized that automating the stringer drilling process would produce higher quality parts at a lower cost. Northrop worked with Electroimpact, Inc. to develop the Automatic Stringer Drilling System (ASDS). The ASDS automatically clamps and drills all straight and contoured stringers used on the 747. Stringers are mounted on a rotating platform that provides +/- 90° of motion. Two servo-servo drills are mounted on a cantilevered arm with 25 feet of X-axis travel.
Technical Paper

Determinate Assembly of Tooling Allows Concurrent Design of Airbus Wings and Major Assembly Fixtures

2004-09-21
2004-01-2832
Most new aircraft programs encounter the challenge of balancing the time required for design optimization with product delivery constraints. The high cost and long lead times of traditional tooling makes it difficult for aircraft manufactures to efficiently meet ever-changing market demands. The large size, low relative stiffness and high positional tolerances required for aircraft components drive the requirement for rigid fixed tooling to maintain the precision part relationships over time. Use of today’s advance 3-Dimensional CAD systems coupled with the high accuracy of CNC machines enables the success of the determinate assembly approach for aircraft tooling. This approach provides the aircraft manufacturer significant lead-time reductions while at the same time it supports enhanced system flexibility. Determinate assembly for aircraft tooling has been proven to be high successful for tooling manufacture on large-scale system such as the A380 and A340–600 wing assembly projects.
Technical Paper

Flex Track for use in Production

2005-10-03
2005-01-3318
Lightweight and flexible automated drilling machines are becoming more common in aerospace industry to address the increase in demand for low cost assembly solutions. Successful production implementation of the Flex Track system has been accomplished by matching applications with appropriate design features. Following the concept of small lightweight machines, which rely on local accuracy and sacrifice stiffness and shear mass, the Flex Track tackles problems on a detail level. This paper describes how the evolutionary progress of the Flex Track drilling system has and continues to address the increase in demand for low cost automated drilling systems.
Technical Paper

Evaluation of the EMR for Swaging Collars on Advanced Composite Laminates

2005-10-03
2005-01-3299
The Boeing 787 Dreamliner will be the most fuel-efficient airliner in the world when it enters service in 2008. To help achieve this, Boeing will utilize state-of-the-art carbon fiber for primary structures. Advanced manufacturing techniques and processes will be used in the assembly of large composite structures. Electroimpact has proposed a system utilizing the low recoil Low Voltage Electromagnetic Riveter (LVER) to drill and install bolts. A test program was initiated between Boeing Materials Process and Engineering (MP&E) and Electroimpact to validate the LVER process for swaging titanium collars on titanium pins in composite material. This paper details the results of these tests.
X