Refine Your Search

Search Results

Viewing 1 to 2 of 2
Technical Paper

Phase III Integrated Water Recovery Testing at MSFC: Closed Hygiene and Potable Loop Test Results and Lesson Learned

1992-07-01
921117
A series of tests has been conducted at the NASA Marshall Space Flight Center (MSFC) to evaluate the performance of a Space Station Freedom (SSF) pre-development water recovery system. Potable, hygiene, and urine reclamation subsystems were integrated with end-use equipment items and successfully operated for a total of 35 days, including 23 days in closed-loop mode with man-in-the-loop. Although several significant subsystem physical anomalies were encountered, reclaimed potable and hygiene water routinely met current SSF water quality specifications. This paper summarizes the test objectives, system design, test activities/protocols, significant results/anomalies, and major lessons learned.
Technical Paper

Phase III Integrated Water Recovery Testing at MSFC: International Space Station Configuration Test Results and Lessons Learned

1995-07-01
951586
A test has been completed at NASA's Marshall Space Flight Center (MSFC) to evaluate the latest Water Recovery and Management (WRM) system and Waste Management (WM) urinal design for the United States On-Orbit Segment (USOS) of the International Space Station (ISS) with higher fidelity hardware and integration than has been achieved in previous integrated tests. Potable and urine reclamation processors were integrated with waste water generation equipment and successfully operated for a total of 116 days to evaluate the impacts of changes made as a result of the redesign from Space Station Freedom (SSF) to the ISS. This testing marked the first occasion in which the WRM was automated at the system level, allowing for evaluation of the hardware performance under ISS operating conditions. It was also the first time a “flight-like” Process Control Water Quality Monitor (PCWQM) and a WM urinal were tested in an integrated system.
X