Refine Your Search

Search Results

Viewing 1 to 2 of 2
Technical Paper

Development of Automated Transfer Vehicle Cargo Carrier (ATVCC) ECLS Air Distribution System based on the MPLM and COLUMBUS Experience

2001-07-09
2001-01-2389
In 1995 the European Space Agency did award a C/D Contract for the design & development of an ECLS Subsystem for the Multi Purpose Logistics Module (MPLM) to Astrium’s ECLS ‘Center of Competence’ that built the ECLSS for Spacelab already. Actually first MPLM modules were successfully flown to the ISS with the Astrium built ECLSS qualified as ‘excellent’ by the crew having asked permission to sleep in there. In parallel the design and development of an ECLS for Europe’s Columbus module did commence and is actually close to completion. In view of the above a broad set of qualified and even space proven ECLS equipment is now ‘on-hands’ to thoroughly compose respectively derive the ECLS subsystems of future applications e.g. HabModule, CRV and Space Hotel at a limited delta design and validation effort thus fitting into the tighter financial budgets of the manned space programs to come.
Journal Article

Design Status of the Closed-Loop Air Revitalization System ARES for Accommodation on the ISS

2008-06-29
2008-01-2189
1 The Closed-Loop Air REvitalisation System ARES is a proof of technology Payload. The objective of ARES is to demonstrate with regenerative processes: the provision of the capability for carbon dioxide removal from the module atmosphere, the return supply of breathable oxygen within a closed-loop process, the conversion of the hydrogen, resulting from the oxygen generation via electrolysis, to water. The ARES Payload is foreseen to be installed - in 2012 - onboard the ISS in the Columbus Module. The operation of ARES - in a representative manned microgravity environment - will produce valuable operational data on a system which is based on technologies which are different from other air revitalization systems presently in use. The ARES Technology Demonstrator Payload development started in 2003 with a Phase B, see references [1], [2], [3] and [4]. ARES is presently in Phase C1 and a PDR is scheduled for the beginning of 2009.
X