Refine Your Search

Topic

Search Results

Viewing 1 to 14 of 14
Technical Paper

Systems Analysis of Life Support for Long-Duration Missions

2000-07-10
2000-01-2394
Work defining advanced life support (ALS) technologies and evaluating their applicability to various long-duration missions has continued. Time-dependent and time-invariant costs have been estimated for a variety of life support technology options, including International Space Station (ISS) environmental control and life support systems (ECLSS) technologies and improved options under development by the ALS Project. These advanced options include physicochemical (PC) and bioregenerative (BIO) technologies, and may in the future include in-situ-resource utilization (ISRU) in an attempt to reduce both logistics costs and dependence on supply from Earth. PC and bioregenerative technologies both provide possibilities for reducing mission equivalent system mass (ESM). PC technologies are most advantageous for missions of up to several years in length, while bioregenerative options are most appropriate for longer missions. ISRU can be synergistic with both PC and bioregenerative options.
Technical Paper

Improved NDI Techniques for Aircraft Inspection

1998-11-10
983105
Through the use of an “Integrated Product Team” approach and new inspection techniques incorporating the latest in imaging capabilities and automation, the costs of some man-power intensive tasks can now be drastically reduced. Also, through the use of advanced eddy current techniques, the detectable size of cracks under flush-head fasteners can be reduced while maintaining reliable inspection. This article describes the evaluation and results obtained using eddy current technology to determine the minimum fasteners, Secondly, it describes the integrated efforts of engineers at Boeing DPD and Northwest Airlines in the successful application of MAUS eddy current scanning of the DC-10 circumferential and axial crow splices. The eddy current scanning greatly reduced the man-hour effort required for the existing radiographic inspection
Technical Paper

Implementation of Long Assembly Drills for 777X Flap Carriers

2024-03-05
2024-01-1923
Large diameter, tightly toleranced fastener patterns are commonplace in aerospace structures. Satisfactory generation of these holes is often challenging and can be further complicated by difficult or obstructed access. Bespoke tooling and drill jigs are typically used in conjunction with power feed units leading to a manual, inflexible, and expensive manufacturing process. For 777X flap production, Boeing and Electroimpact collaborated to create a novel, automated solution to generate the fastener holes for the main carrier fitting attachment pattern. Existing robotic automation used for skin to substructure assembly was modified to utilize extended length (up to 635mm), bearing-supported drill bar sub-assemblies. These Long Assembly Drills (LADs) had to be easily attached and detached by one operator, interface with the existing spindle(s), supply cutting lubricant, extract swarf on demand, and include a means for automatically locating datum features.
Technical Paper

Evaluation of the EMR for Swaging Collars on Advanced Composite Laminates

2005-10-03
2005-01-3299
The Boeing 787 Dreamliner will be the most fuel-efficient airliner in the world when it enters service in 2008. To help achieve this, Boeing will utilize state-of-the-art carbon fiber for primary structures. Advanced manufacturing techniques and processes will be used in the assembly of large composite structures. Electroimpact has proposed a system utilizing the low recoil Low Voltage Electromagnetic Riveter (LVER) to drill and install bolts. A test program was initiated between Boeing Materials Process and Engineering (MP&E) and Electroimpact to validate the LVER process for swaging titanium collars on titanium pins in composite material. This paper details the results of these tests.
Technical Paper

Drilling Mixed Stack Materials for the BOEING 787

2010-09-28
2010-01-1867
The new combinations such as composites and titanium that are being used on today's new airplanes are proving to be very challenging when drilling holes during manufacturing and assembly operations. Gone are the days of hand drilling with high speed steel drills through soft aluminum structure, after which aluminum rivets would be swaged into those holes with very generous tolerances. The drilling processes today need to use cutter materials hard enough and tough enough to cut through hard metals such as titanium, yet be sharp enough to resistant abrasion and maintain size when drilling through composites. There is a constant search for better cutters and drills that can drill a greater number of holes. The cost of materials used in today's aircraft is much higher. The cutting tools are more expensive and the hole tolerances are much tighter.
Technical Paper

Development of a Mobile Drilling and Fastening System Based on a PKM Robotic Platform

2015-09-15
2015-01-2509
The Boeing Company has developed a mobile robotic drilling and fastening system for use in assembly processes on the lower panel of a horizontally fixtured wing. The robotic system, referred to as Lower-panel Drilling and Fastening System (LPDFS), was initially developed as part of an initiative to minimize facilities costs by not requiring costly foundation work. It is designed to operate with a high level of autonomy, minimizing operator intervention, including that required for machine setup and tool changes. System design enables positioning the work piece at a lower ergonomic height for concurrent manual processes. In all aspects of design, the system will maintain maximum flexibility for accommodating future manufacturing changes and increases in production rate, while meeting the strict accuracy requirements characteristic of aircraft manufacturing.
Technical Paper

Costs and Benefits of Bioreactors

2002-07-15
2002-01-2523
Different options have been examined for providing minerals to plants for bioregeneration. The baseline option is to ship the minerals. The equivalent system mass of two different bioreactor systems for recycling a portion of these minerals, a fixed-film bioreactor and a stirred-tank reactor are calculated. Either option could reduce the ESM for providing these minerals for a 15-year mission to Mars, with 50% food closure.
Technical Paper

Corrosion Testing of Brazed Space Station IATCS Materials

2004-07-19
2004-01-2471
Increased nickel concentrations in the IATCS coolant prompted a study of the corrosion rates of nickel-brazed heat exchangers in the system. The testing has shown that corrosion is occurring in a silicon-rich intermetallic phase in the braze filler of coldplates and heat exchangers as the result of a decrease in the coolant pH brought about by cabin carbon dioxide permeation through polymeric flexhoses. Similar corrosion is occurring in the EMU de-ionized water loop. Certain heat exchangers and coldplates have more silicon-rich phase because of their manufacturing method, and those units produce more nickel corrosion product. Silver biocide additions did not induce pitting corrosion at silver precipitate sites.
Technical Paper

Comparison of Waste Systems

2004-07-19
2004-01-2581
A summary of waste processes and waste process data is presented in the context of mission equivalent system mass. Storage, size reduction, drying, aerobic and anaerobic biodegradation, chemical oxidation, pyrolysis, and post processing are evaluated in the context of probable long-duration missions beyond LEO, and the probable quantities and types of wastes and of the other on-board systems. An assessment of the waste systems described in the ALS Reference Missions Document is presented, and rationale for some changes to these systems is provided.
Technical Paper

Clothing Systems for Long Duration Space Missions

2004-07-19
2004-01-2580
Clothing accounts for a surprisingly large quantity of resupply and waste on the International Space Station (ISS), of the order of 14% of the equivalent system mass (ESM). Efforts are underway in the ISS program to reduce this, but much greater changes are likely to be possible and justifiable for long duration missions beyond low Earth orbit (LEO). Two approaches are being assessed for long duration missions: to reduce the mass of the wardrobe through use of lighter fabrics, and to clean clothing on board for reuse. Through good design including use of modern fabrics, a lighter weight wardrobe is expected to be feasible. Collateral benefits should include greater user comfort and reduced lint generation. A wide variety of approaches to cleaning is possible. The initial evaluation was made based on a terrestrial water-based washer and dryer system, as this represents the greatest experience base.
Technical Paper

Clarifying Objectives and Results of Equivalent System Mass Analyses for Advanced Life Support

2003-07-07
2003-01-2631
This paper discusses some of the analytical decisions that an investigator must make during the course of a life support system trade study. Equivalent System Mass (ESM) is often applied to evaluate trade study options in the Advanced Life Support (ALS) Program. ESM can be used to identify which of several options that meet all requirements are most likely to have lowest cost. It can also be used to identify which of the many interacting parts of a life support system have the greatest impact and sensitivity to assumptions. This paper summarizes recommendations made in the newly developed ALS ESM Guidelines Document and expands on some of the issues relating to trade studies that involve ESM.
Technical Paper

An Automated Production Fastening System for LGP and Hi-Lok Titanium Bolts for the Boeing 737 Wing Panel Assembly Line

2015-09-15
2015-01-2514
A new automated production system for installation of Lightweight Groove Proportioned (LGP) and Hi-Lock bolts in wing panels has been implemented in the Boeing 737 wing manufacturing facility in Renton, Washington. The system inserts LGP and Hi-Lok bolts into interference holes using a ball screw mechanical squeeze process supported by a back side rod-locked pneumatic clamp cylinder. Collars are fed and loaded onto a swage die retaining pin, and swaging is performed through ball screw mechanical squeeze. Offset and straight collar tools allow the machine to access 99.9% of fasteners in 3/16″, ¼″ and 5/16″ diameters. Collar stripping forces are resolved using a dynamic ram inertial technique that reduces the pull on the work piece. Titanium TN nuts are fed and loaded into a socket with a retaining spring, and installed on Hi-Loks Hi-Lok with a Bosch right angle nut runner.
Technical Paper

Advanced Vehicle Wire Health for the 21st Century

2004-11-02
2004-01-3159
Traditionally, vehicle power wiring safety has consisted of a reactive thermal circuit breaker that responds to an overload condition. In addition, maintenance operations have been reactive as well, searching for a possible damaged section of wiring in a large and often difficult to access wire bundle. Advancements in detection of changes in impedance, arc, corona, and reflectometry to measure general wire damage have the potential to automate the process, while increasing vehicle safety and reducing costs. Some of these technologies are also pro-active and can warn of a potential problem during routine maintenance checks using hand held instrumentation or if embedded in a vehicle can detect problems prior to power up or after system power up using real-time monitoring.
Technical Paper

A Selected Operational History of the Internal Thermal Control System (ITCS) for International Space Station (ISS)

2004-07-19
2004-01-2470
The Internal Thermal Control System (ITCS) has been developed jointly by Boeing Corporation, Huntsville, Alabama and Honeywell Engines & Systems, Torrance, California to meet the internal thermal control needs for the International Space Station (ISS). The ITCS provides heat removal for the critical life support systems and thermal conditioning for numerous experiment racks. The ITCS will be fitted on a number of modules on the ISS. The first US Element containing the ITCS, Node 1, was launched in December 1998. Since Node 1 does not contain a pump to circulate the fluid it was not filled with ITCS fluid until after the US Laboratory Module was installed. The second US Element module, US Laboratory Module, which contains the pumps and all the major ITCS control hardware, was launched in February 2001. The third US Element containing the ITCS, the US Airlock, was launched in July 2001.
X