Refine Your Search

Search Results

Viewing 1 to 2 of 2
Technical Paper

Carbon Dioxide Removal Assembly Software Product Improvements

2004-07-19
2004-01-2545
The Carbon Dioxide Removal Assembly (CDRA) on board the International Space Station (ISS) has experienced periodic check valve and selector valve failures as a result of a gradual build-up of contamination from particles that have breeched the adsorbent bed seals. The current software that controls CDRA has limitations that make troubleshooting the unit difficult in these situations, in large part due to the fact that valve position telemetry is only available during certain times. There are also situations where it is required to perform operations manually that would benefit from added code logic and commands to facilitate these operations. The software has been reviewed for possible upgrades and changes that will allow engineers to better troubleshoot the unit in the event of various failures and also allow for better operability in degraded states.
Journal Article

1-g Suit Port Concept Evaluator 2008 Test Results

2009-07-12
2009-01-2572
The Lunar Electric Rover (LER), which was formerly called the Small Pressurized Rover (SPR), is currently being carried as an integral part of the lunar surface architectures that are under consideration in the Constellation Program. One element of the LER is the suit port, which is the means by which crew members perform Extravehicular Activities (EVAs). Two suit port deliverables were produced in fiscal year 2008: a 1-g suit port concept evaluator for functional integrated testing with the LER 1-g concept vehicle and a functional and pressurizable Engineering Unit (EU). This paper focuses on the 1-g suit port concept evaluator test results from the Desert Research and Technology Studies (D-RATS) October 2008 testing at Black Point Lava Flow (BPLF), Arizona. The 1-g suit port concept evaluator was integrated with the 1-g LER cabin and chassis concepts.
X