Refine Your Search

Topic

Search Results

Technical Paper

Updating the Tools Used to Estimate Space Radiation Exposures for Operations: Codes, Models, and Interfaces

2002-07-15
2002-01-2457
In order to estimate the exposure to a crew in space, there are three essential steps to be performed: first, the ambient radiation environment at the vehicle must be characterized; second, the mass distribution properties of the vehicle, including the crewmembers themselves must be developed, and third a model of the interactions of space radiations with matter must be employed in order to characterize the radiation field at the dose point of interest. The Space Radiation Analysis Group (SRAG) at the NASA, Johnson Space Center carries the primary responsibility for the operational radiation protection support function associated with manned space flight. In order to provide support during the various planning, execution, and analysis/recording phase activities associated with a given mission, tools have been developed to allow rapid, repeatable calculations of exposure on orbit.
Technical Paper

The Lunar-Mars Life Support Test Project Phase III 90-day Test: The Crew Perspective

1998-07-13
981702
The Lunar-Mars Life Support Test Project (LMLSTP) Phase III test examined the use of biological and physicochemical life support technologies for the recovery of potable water from waste water, the regeneration of breathable air, and the maintenance of a shirt-sleeve environment for a crew of four persons for 91 days. This represents the longest duration ground-test of life support systems with humans performed in the United States. This paper will describe the test from the inside viewpoint, concentrating on three major areas: maintenance and repair of life support elements, the scientific projects performed primarily in support of the International Space Station, and numerous activities in the areas of public affairs and education outreach.
Technical Paper

The Food System for the International Space Station: The First Five Increments

2003-07-07
2003-01-2426
The International Space Station (ISS) has been continuously crewed for more than 2 years. One of the major systems for crew health, performance and psychological support is the food system. This paper documents the mechanics of implementation for the ISS food system, with emphasis on the U.S. portion of that system, and also provides some performance feedback received from the first 5 increment crews. Menu composition and planning, food stowage, on orbit preparation, shipments, and inventory control are also described.
Technical Paper

Summary of Resources for the International Space Station Environmental Control and Life Support System for Core Complete Modules

2004-07-19
2004-01-2386
The Core Complete Environmental Control and Life Support (ECLS) system for the International Space Station (ISS) will consist of components and subsystems in both the United States (U.S.) and International Partner elements which together will perform the functions of Temperature and Humidity Control (THC), Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Water Recovery and Management (WRM), Fire Detection and Suppression (FDS), and Vacuum System (VS) for the station. Due to limited resources available on ISS, detailed attention is given to minimizing and tracking all resources associated with all systems, beginning with estimates during the hardware development phase through measured actuals when flight hardware is built and delivered. A summary of resources consumed by the current and by the addition of future U.S.
Technical Paper

Space Shuttle Launch Entry Suit Thermal Performance Evaluation

1993-07-01
932297
Comments of the Space Shuttle crew indicate that the Launch Entry Suit (LES) may provide inadequate cooling before launch and after reentry. During these periods some crewmembers experienced thermal discomfort induced by localized cabin heating, middeck experiments, and crewmembers' body heat and humidity. The NASA Johnson Space Center(JSC) Crew and Thermal System Division (CTSD) executed a two phase study, analysis and testing, to investigate this problem. The analysis phase used a computer model of the LES to study the transient heat dissipation and temperature response under the various Space Shuttle flight cabin environments. After the completion of the analysis, the testing phase was conducted to collect the engineering data in order to validate the analysis results. Due to the constraint of the test facility, the test was conducted on the air cooled techniques only. This paper presents the analytical model, its solution and an evaluation and summary of the test results.
Technical Paper

Project Orion, Environmental Control and Life Support System Integrated Studies

2008-06-29
2008-01-2086
Orion is the next vehicle for human space travel. Humans will be sustained in space by the Orion subystem, environmental control and life support (ECLS). The ECLS concept at the subsystem level is outlined by function and technology. In the past two years, the interface definition with other subsystems has increased through different integrated studies. The paper presents the key requirements and discusses three recent studies (e.g., unpressurized cargo) along with the respective impacts on the ECLS design moving forward.
Technical Paper

Life Sciences Space Biology Project Planning

1988-07-01
881075
Life sciences research facilities planned for the U.S. Space Station will accommodate life sciences investigations addressing the influence of microgravity on living organisms. Current projects within the Life Sciences Space Station Program (LSSSP), the Life Sciences Space Biology (LSSB) and Extended Duration Crew Operations (EDCO) projects, will explore the physiological, clinical, and sociological implications of long duration space flight on humans and the influence of microgravity on other biological organisms/systems. Initially, the primary research will emphasize certifying man for routine 180-day stays on the Space Station. Operational crew rotations of 180 days or more will help reduce Space Station operational costs and minimize the number of Space Transportation System (STS) shuttle flights required to support Space Station.
Journal Article

Lessons Learned from the International Space Station (ISS) Environmental Control and Life Support System (ECLSS) Water Subsystem

2008-06-29
2008-01-2008
The International Space Station (ISS) has served as an excellent test bed for the implementation and integration of several life support systems, and has offered many lessons that can be applied to future vehicles and program. This paper focuses on those lessons learned within the Environmental Control and Life Support (ECLS) Water Subsystem, which have dictated on-orbit system performance and forced many operational controls. These include lessons on the need for precise documentation and testing, pros and cons of different types of storage containers, and the need for designing systems to have accessibility and flexibility. This paper describes the issues encountered on ISS and suggests solutions for future systems in the form of recommendations and questions posed to the future designers.
Technical Paper

International Space Station Environmental Control and Life Support System Status: 2008 – 2009

2009-07-12
2009-01-2415
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2008 and February 2009. The ISS continued permanent crew operations, with the continuation of Phase 3 of the ISS Assembly Sequence. Work continues on the last of the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.
Technical Paper

International Space Station Environmental Control and Life Support System Status: 2007 - 2008

2008-06-29
2008-01-2131
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2007 and February 2008. The ISS continued permanent crew operations, with the continuation of Phase 3 of the ISS Assembly Sequence. Work continues on the last of the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.
Technical Paper

International Space Station Environmental Control and Life Support System Status: 2005 - 2006

2006-07-17
2006-01-2055
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2005 and February 2006. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.
Technical Paper

International Space Station Environmental Control and Life Support System Status: 2004 - 2005

2005-07-11
2005-01-2777
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between March 2004 and February 2005. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.
Technical Paper

International Space Station Environmental Control and Life Support System Status: 2003 - 2004

2004-07-19
2004-01-2382
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between April 2003 and March 2004. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.
Technical Paper

International Space Station Environmental Control and Life Support System Status: 2002 – 2003

2003-07-07
2003-01-2589
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between April 2002 and March 2003. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements with Node 3 just completing its final design review so that it can proceed towards manufacturing and the continued manufacturing of the regenerative ECLS equipment that will be integrated into Node 3.
Technical Paper

International Space Station Environmental Control and Life Support System On-Orbit Station Development Test Objective Status

2003-07-07
2003-01-2593
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the ECLS System On-Orbit Station Development Test Objective (SDTO) status from the start of assembly until the end of February 2003.
Technical Paper

International Space Station Environmental Control and Life Support System Changes for Increasing the ISS Crew Size to Six Crew Members and for Shuttle Retirement

2008-06-29
2008-01-2178
With the long anticipated change to increase the International Space Station (ISS) crew size from three to six crew members and the retirement of the Space Shuttle, changes are in work to the International Space Station (ISS) Environmental Control and Life Support (ECLS) System to support the increased on-orbit crew size and their continued operations. The Space Shuttle had provided high pressure oxygen resupply, high pressure nitrogen resupply, water resupply, atmosphere gaseous make up when the Space Shuttle is docked to ISS, and logistic cargo supply/return capability to ISS. Without the Space Shuttle additional changes need to be made to the ISS ECLS System to support the six crew members post Assembly Complete (AC). This will be in addition to the changes that were needed to support doubling the nominal ISS crew size from three to six crew members.
Technical Paper

International Space Station Environmental Control and Life Support System Acceptance Testing for the Pressurized Mating Adapters

2008-06-29
2008-01-2182
The International Space Station (ISS) Pressurized Mating Adapters (PMAs) Environmental Control and Life Support (ECLS) System is comprised of three subsystems: Atmosphere Control and Supply (ACS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). PMAs 1 and 2 flew to ISS on Flight 2A and Pressurized Mating Adapter (PMA) 3 flew to ISS on Flight 3A. This paper provides a summary of the PMAs ECLS design and a detailed discussion of the ISS ECLS Acceptance Testing methodologies utilized for the PMAs.
Technical Paper

International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Water Recovery and Management Subsystems

2008-06-29
2008-01-2183
The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS WRM subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.
Technical Paper

International Space Station Environmental Control And Life Support System Status: 2001-2002

2002-07-15
2002-01-2494
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between May 2001 and April 2002. The ISS continued permanent crew operations, with Phase 2 completion accomplished during this period. Work continued on the Phase 3 elements with Node 3 proceeding toward a final design review and the regenerative ECLS equipment proceeding into manufacturing.
Technical Paper

Effect of Local Hand Thermal Insulation on Total and Local Comfort Under Different Levels of Body Heat Deficit

2005-07-11
2005-01-2977
Introduction: There are contradictory opinions regarding the contribution of local hand thermal insulation to support local and total comfort during extravehicular activity (EVA). Instead of a local correction by means of thermal insulation on the periphery of the body to prevent heat dissipation, it may be optimal to prevent heat dissipation from the body core. To examine such a concept, the effects of different insulation levels on the left and right hands on the heat flux and temperature mosaic on the hands was measured. These variables were assessed in relation to the level of heat deficit forming in the core organs and tissues. Methods: Six subjects (4 males, 2 females) were donned in a liquid cooling/warming garment (LCWG) that totally covered the body surface except for the face. Participants wore the Phase VI space gloves including the entire micrometeoroid garment (TMG) on the left hand, and the glove without the TMG on the right hand.
X