Refine Your Search

Topic

Search Results

Viewing 1 to 17 of 17
Standard

Rated Capacity Systems

2012-03-06
WIP
J159
This SAE Standard applies to cranes when used in lifting service that are equipped with Rated Capacity Systems. Purpose The purpose of this document is to establish the minimum performance and tolerance criteria of systems used to warn or to indicate to the operator and/or other responsible persons when the load being lifted approaches, meets and exceeds the rated capacity on the applicable rated capacity chart of the crane.
Standard

Lifting Crane Sheave and Drum Sizes

2021-10-21
CURRENT
J881_202110
This SAE Standard covers minimum dimensional relationship for sheaves, drums, and wire rope for mobile, construction type lift cranes.
Standard

LIFTING CRANE, WIRE-ROPE STRENGTH FACTORS

1991-05-01
HISTORICAL
J959_199105
This SAE Standard applies to all mobile, construction-type, lifting cranes as equipped for operation with hook, clamshell, magnet, and grapple attachments. It is not applicable to excavating and demolition attachments such as shovels, hoes, draglines, and wrecking balls.
Standard

LIFTING CRANE SHEAVE AND DRUM SIZES

1985-02-01
HISTORICAL
J881_198502
This SAE Standard covers minimum dimensional relations for sheaves, drums, and wire rope for mobile, construction type lift cranes.
Standard

Crane and Cable Excavator Basic Operating Control Arrangements

1998-10-01
CURRENT
J983_199810
This SAE Recommended Practice applies to mobile, construction type, crane and cable excavator hand and foot controls. It should not be construed to limit the use of, or to apply to combination controls, automatic controls, or any other special operating control requirements.
Standard

Crane and Cable Excavator Basic Operating Control Arrangements

2016-12-07
WIP
J983
This SAE Recommended Practice applies to mobile, construction type, crane and cable excavator hand and foot controls. It should not be construed to limit the use of, or to apply to combination controls, automatic controls, or any other special operating control requirements.
Standard

Crane Boomstop

2017-10-09
CURRENT
J220_201710
This SAE Recommended Practice applies to the boomstop for the main boom of all mobile construction type cranes having rope supported booms, equipped for hook work, clamshell, magnet, grapple, or concrete bucket attachments.
Standard

Crane Boomstop

2012-02-06
HISTORICAL
J220_201202
This SAE Recommended Practice applies to the boomstop for the main boom of all mobile construction type cranes having rope supported booms, equipped for hook work, clamshell, magnet, grapple, or concrete bucket attachments.
Standard

Crane Boom Hoist Disengaging Device

2021-09-20
CURRENT
J999_202109
This SAE Standard applies to cranes which are equipped to adjust the boom angle by hoisting and lowering means through rope reeving.
Standard

Crane Boom Hoist Disengaging Device

2011-08-04
HISTORICAL
J999_201108
This SAE Standard applies to cranes which are equipped to adjust the boom angle by hoisting and lowering means through rope reeving.
Standard

CANTILEVERED BOOM CRANE STRUCTURES—METHOD OF TEST

1993-11-18
HISTORICAL
J1063_199311
This SAE Standard applies to mobile, construction-type lifting cranes of the cantilever boom type (Figure 1). Questions and comments regarding application or interpretation of the provisions in this test method should be referred to the originating SAE Committee.1
X