Refine Your Search

Search Results

Viewing 1 to 2 of 2
Standard

Guidelines for Preparing Reliability Assessment Plans for Electronic Engine Controls

2018-05-07
CURRENT
ARP5890B
This document establishes guidelines for a Reliability Assessment Plan (herein also called the Plan), in which Electronic Engine Control manufacturers document their controlled, repeatable processes for assessing reliability of their products. Each Electronic Engine Control manufacturer (the Plan owner) prepares a Plan, which is unique to the Plan owner. This document describes processes that are intended for use in assessing the reliability of Electronic Engine Controls, or subassemblies thereof. The results of such assessments are intended for use as inputs to safety analyses, certification analyses, equipment design decisions, system architecture selection and business decisions such as warranties or maintenance cost guarantees.
Standard

External Software Loading of Electronic Engine Controls

2012-09-25
CURRENT
ARP4714A
This paper presents guidelines for development of a procedure for external software loading of an electronic engine control (EEC) for a commercial application, on-wing or in a qualified service shop. This paper makes the following assumptions: a The EEC is designed to accept external software loading. b The EEC is certified as part of an engine. c The support equipment is qualified in accordance with procedures set forth by the engine (and aircraft, if necessary) certifying authority if the EEC cannot detect an integrity violation of the loaded program. d The software to be loaded has been approved by the engine and aircraft certifying authorities. e One or more configurations of EEC hardware has been identified for each version of software which is to be loaded in the EEC. It is appropriate to use these guidelines in the initial development phase, although the certification issues would not be applicable.
X