Refine Your Search

Search Results

Viewing 1 to 5 of 5
Standard

Installation Procedures and Torques for Fluid Connections

2012-03-01
HISTORICAL
AS683D
These procedures cover the following: Paragraph 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket. Paragraph 4 - Boss end connections, positioned type, with back-up ring. Paragraph 5 - Boss end connections, positioned type, without back-up ring Paragraph 6 - Boss end connections, non-positioned type. Paragraph 7 - Bulkhead connections.
X