Refine Your Search

Search Results

Viewing 1 to 3 of 3
Technical Paper

Robotic Installation of OSI-Bolts

2015-09-15
2015-01-2512
Electroimpact has developed an automated solution for installing OSI-Bolts on the HStab for Boeing's 787-9 aircraft. This solution utilizes Electroimpact's existing accurate robotic system together with new hardware designed specifically for OSI-Bolts. In addition to automated drilling and fastener installation, this system performs numerous quality checks to insure the installed fastener meets engineering requirements. Before installing the fastener, the system measures actual stack thickness and the length of the fastener to ensure that the proper grip is installed. Torque and angle feedback are recorded during installation which can be used determine if the fastener was installed correctly. The system will also automatically shave the small protuberance on the fastener head left by the broken off fastener stem, which is inherent to the OSI-Bolt. Figure 1 Cell Overview
Technical Paper

Integration and Qualification of the HH500 Hand Operated Electromagnetic Riveting System on the 747 Section 11

1993-09-01
931760
Hand installation of 3/8", 5/16" and 1/4" diameter fatigue head style fasteners is required on some areas of 747 section 11 (center wing). The 3/8" diameter fasteners can require between 45-60 seconds to upset using conventional pneumatic riveting guns. As part of Boeing’s continuing effort to reduce cycle time and improve the factory working environment, a Boeing Quality Circle Team proposed using LVER technology as an alternative to conventional pneumatic percussion riveting hammers The hand operated HH500 system was developed in response to this request. The HH500 single shot upset reduces installation time as well as the noise levels and vibration experienced by the operators. The design of this system and the integration onto the factory floor are presented. The LVER forming rate is significantly higher than that of conventional pneumatic and hydraulic processes.
Technical Paper

Evaluation of the EMR for Swaging Collars on Advanced Composite Laminates

2005-10-03
2005-01-3299
The Boeing 787 Dreamliner will be the most fuel-efficient airliner in the world when it enters service in 2008. To help achieve this, Boeing will utilize state-of-the-art carbon fiber for primary structures. Advanced manufacturing techniques and processes will be used in the assembly of large composite structures. Electroimpact has proposed a system utilizing the low recoil Low Voltage Electromagnetic Riveter (LVER) to drill and install bolts. A test program was initiated between Boeing Materials Process and Engineering (MP&E) and Electroimpact to validate the LVER process for swaging titanium collars on titanium pins in composite material. This paper details the results of these tests.
X