Refine Your Search

Topic

Search Results

Standard

APU Gas Turbine Engine Test Cell Correlation

2007-12-19
HISTORICAL
ARP5435
This paper describes a recommended practice and procedure for the correlation of test cells that are used for the performance testing of APU (auxiliary power unit) engines. Test cell correlation is performed to determine the effect of any given test cell enclosure and equipment on the performance of an engine relative to the baseline performance of that engine. The baseline performance is generally determined at the OEM designated test facility.
Standard

APU Gas Turbine Engine Test Cell Correlation

2023-05-19
CURRENT
ARP5435A
This paper describes a recommended practice and procedure for the correlation of test cells that are used for the performance testing of APU (auxiliary power unit) engines. Test cell correlation is performed to determine the effect of any given test cell enclosure and equipment on the performance of an engine relative to the baseline performance of that engine. The baseline performance is generally determined at the original equipment manufacturer (OEM) designated test facility. Although no original equipment manufacturer (OEM) documents are actually referenced, the experience and knowledge of several OEMs contributed to the development of this document. Each engine Manufacturer has their own practices relating to correlation and they will be used by those OEMs for the purpose of establishing certified test facilities.
Standard

Acoustical Considerations for Engine Test Cells

2018-11-21
CURRENT
ARP5759
This document discusses, in broad and general terms, the subject of acoustical considerations in engine test cells. One of the primary purposes of an engine test cell is to control the noise emanating from the operating engine in order to reduce noise in the surrounding facility and community to acceptable levels. This is done by the design and installation of specialized acoustic elements and features, which need to be fully integrated into the overall test cell design. It should be further noted, that the requirements of acoustic control are critical to the proper operation of the engine, safety of plant equipment and personnel, and meeting local and legal noise requirements.
Standard

Configuration Control for Maintaining Correlation of Gas Turbine Engine Test Cells

2022-10-05
WIP
ARP6028B
The FAA has issued Advisory Circular, AC43-207, that recommends re-correlation, trending or period checks. The FAA, AC43-207 bases their recommendation on ARP741. This paper describes a recommended practice and procedure for the configuration control requirements to maintain test cell correlation status. This is necessary to maintain performance measurement integrity, particularly when correlation approval is achieved by statistical trending. The configuration of a test facility that exists at the time when a correlation is being carried out should be "base lined" as a condition of correlation approval acceptance, and, be maintained during the time period that the respective correlation approval lasts. This defines test facility configuration control. This is due to the fact that a change in configuration may have the potential to change the established correlation factors and measured engine performance.
Standard

Configuration Control for Maintaining Correlation of Gas Turbine Engine Test Cells

2020-10-21
CURRENT
ARP6028A
The FAA has issued Advisory Circular, AC43-207, that recommends re-correlation, trending or period checks. The FAA, AC43-207 bases their recommendation on ARP741. This paper describes a recommended practice and procedure for the configuration control requirements to maintain test cell correlation status. This is necessary to maintain performance measurement integrity, particularly when correlation approval is achieved by statistical trending. The configuration of a test facility that exists at the time when a correlation is being carried out should be "base lined" as a condition of correlation approval acceptance, and, be maintained during the time period that the respective correlation approval lasts. This defines test facility configuration control. This is due to the fact that a change in configuration may have the potential to change the established correlation factors and measured engine performance.
Standard

Configuration Control for Maintaining Correlation of Gas Turbine Engine Test Cells

2009-03-13
HISTORICAL
ARP6028
The configuration of a test facility that exists at the time when a correlation is being carried out should be “base lined” as a condition of correlation approval acceptance, and, be maintained during the time period that the respective correlation approval lasts. This defines test facility configuration control. This is due to the fact that a change in configuration may have the potential to change the established correlation factors and measured engine performance. If such a change occurs then this should be judged by the respective OEM’s or designated correlation approval authorities Subject Matter Expert (SME). In some cases, this may involve consultation with the engine project customer or airworthiness authorities.
Standard

DESIGN CONSIDERATIONS FOR ENCLOSED TURBOFAN/TURBOJET ENGINE TEST CELLS

1995-10-01
HISTORICAL
AIR4869
This SAE Aerospace Information Report (AIR) has been written for individuals associated with the ground-level testing of large and small gas turbine engines and particularly for those who might be interested in upgrading their existing or acquiring new test cell facilities.
Standard

Design Considerations for Enclosed Turbofan/Turbojet Engine Test Cells

2021-02-01
CURRENT
AIR4869B
This SAE Aerospace Information Report (AIR) has been written for individuals associated with the ground-level testing of large and small gas turbine engines and particularly for those who might be interested in upgrading their existing or acquiring new test cell facilities.
Standard

Design Considerations for Enclosed Turbofan/Turbojet Engine Test Cells

2020-10-22
HISTORICAL
AIR4869A
This SAE Aerospace Information Report (AIR) has been written for individuals associated with the ground-level testing of large and small gas turbine engines and particularly for those who might be interested in upgrading their existing or acquiring new test cell facilities.
Standard

Design Considerations for Enclosed Turboprop Engine Test Cells

2018-11-21
CURRENT
AIR5295A
This document is offered to provide state-of-the-art information about design factors that must be considered in the design of new or significantly modified engine test cells used to test propeller equipped turboprop engines in either QEC or bare engine configurations. The report does not address design considerations for test cells designed to test turboprop engines with dynamometer type load absorption devices because they are essentially tested as turboshaft engines. Design considerations for those test cells are presented in AIR4989, Reference 2.1.
Standard

Design Considerations for Enclosed Turboprop Engine Test Cells

2007-11-15
HISTORICAL
AIR5295
This document is offered to provide state-of-the-art information about design factors that must be considered in the design of new or significantly modified engine test cells used to test propeller equipped turboprop engines in either QEC or bare engine configurations. The report does not address design considerations for test cells designed to test turboprop engines with dynamometer type load absorption devices because they are essentially tested as turboshaft engines. Design considerations for those test cells are presented in AIR4989, Reference 2.1.
Standard

Design Considerations for Hush House Facilities

2018-11-26
WIP
AIR9969
to provide industry with a reference document highlighting the necessary design considerations and configuration option for an aircraft fully enclosed test facility (Hush House).
Standard

Design Considerations for a relocatable Test Cell

2023-11-15
WIP
ARP8477
Highlight items cell design features that can make it less difficult to physically move a test cell at a future date. A relocatable test cell is one that can be deconstructed and constructed again on a new site where as a mobile test cell is routinely moved.
Standard

Design, Calibration, and Test Methods for Turbine Engine Icing Test Facilities

2023-05-19
CURRENT
AIR6189
This SAE Aerospace Information Report (AIR) provides descriptions of test procedures and established practices for the application, use, and administration of the conduct of icing testing for all types of turbine engines in conventional supercooled liquid (14 CFR Part 25 Appendix C) environmental conditions in ground test facilities (sea-level and altitude) for icing certification purposes.
Standard

GAS TURBINE ENGINE FUEL NOZZLE TEST PROCEDURES

2007-11-15
HISTORICAL
ARP4865
The intent of this SAE Aerospace Recommended Practice (ARP) is to define and recommend to the Aerospace Industry standardized test procedures for establishing fuel nozzle operating performance including types of tests, controlled and measured parameters, and test configurations.
Standard

GAS TURBINE ENGINE TEST CELL CORRELATION

1961-08-01
HISTORICAL
ARP741
This recommended practice considers many facets of testing which have a bearing on obtaining accurate, repeatable engine performance data. These are: ◦ TEST CELL CONFIGURATIONS ◦ TEST CELL INSTRUMENTATION ◦ ENGINE PERFORMANCE CORRECTION FACTORS ◦ TEST CELL EFFECTS ◦ INSTRUMENTATION CALIBRATION ◦ CORRELATION TEST PROGRAM
Standard

Gas Turbine Engine Fuel Nozzle Test Procedures

2013-12-10
CURRENT
ARP4865A
The intent of this SAE Aerospace Recommended Practice (ARP) is to define and recommend to the Aerospace Industry standardized test procedures for establishing fuel nozzle operating performance including types of tests, controlled and measured parameters, and test configurations.
Standard

Gas Turbine Engine Test Facility Audit Process

2023-05-17
WIP
ARP6196A
This SAE Aerospace Recommended Practice provides recommendations for: • the audit process in general; • a list of specific areas of attention to be audited; • maintaining the test facility in such a manner that it meets audit requirements.
Standard

Gas Turbine Engine Test Facility Audit Process

2018-01-04
CURRENT
ARP6196
This SAE Aerospace Recommended Practice provides recommendations for: the audit process in general; a list of specific areas of attention to be audited; maintaining the test facility in such a manner that it meets audit requirements.
X