Refine Your Search

Topic

Search Results

Standard

Broadband PLC Communication for Plug-in Electric Vehicles

2014-10-21
HISTORICAL
J2931/4_201410
This SAE Technical Information Report SAE J2931/4 establishes the specifications for physical and data-link layer communications using broadband Power Line Communications (PLC) between the plug-In electric vehicle (PEV) and the electric vehicle supply equipment (EVSE) DC off-board-charger. This document deals with the specific modifications or selection of optional features in HomePlug Green PHY v1.1 (HomePlug GP1.1) necessary to support the automotive charging application over Control Pilot lines as described in SAE J1772™. PLC may also be used to connect directly to the Utility smart meter or home area network (HAN), and may technically be applied to the AC mains, both of which are outside the scope of this document.
Standard

Broadband PLC Communication for Plug-in Electric Vehicles

2023-05-24
CURRENT
J2931/4_202305
This SAE Technical Information Report SAE J2931/4 establishes the specifications for physical and data-link layer communications using broadband Power Line Communications (PLC) between the plug-In electric vehicle (PEV) and the electric vehicle supply equipment (EVSE) DC off-board-charger. This document deals with the specific modifications or selection of optional features in HomePlug Green PHY v1.1 (HomePlug GP1.1) necessary to support the automotive charging application over Control Pilot lines as described in SAE J1772™. PLC may also be used to connect directly to the Utility smart meter or home area network (HAN), and may technically be applied to the AC mains, both of which are outside the scope of this document.
Standard

Communication Between Plug-In Vehicles and Off-Board DC Chargers

2012-08-20
HISTORICAL
J2847/2_201208
This SAE Recommended Practice SAE J2847-2 establishes requirements and specifications for communication between PLUG-IN ELECTRIC VEHICLE (EVCC)s and the DC Off-board charger. Where relevant, this document notes, but does not formally specify, interactions between the vehicle and vehicle operator. This document applies to the off-board DC charger for conductive charging, which supplies DC current to the RESS of the electric vehicle through a SAE J1772™ coupler. Communications will be on the J1772 Pilot line for PLC communication. The details of PLC communications are found in SAE J2931/4. The specification supports DC energy transfer via Forward Power Flow (FPF) from source to vehicle.
Standard

Communication Between Plug-In Vehicles and Off-Board DC Chargers

2015-04-09
HISTORICAL
J2847/2_201504
This SAE Recommended Practice SAE J2847-2 establishes requirements and specifications for communication between Plug-in Electric Vehicle (PEV) and the DC Off-board charger. Where relevant, this document notes, but does not formally specify, interactions between the vehicle and vehicle operator. This document applies to the off-board DC charger for conductive charging, which supplies DC current to the Rechargable Energy Storage System (RESS) of the electric vehicle through a SAE J1772™ coupler. Communications will be on the SAE J1772 Pilot line for PLC communication. The details of PowerLine Communications (PLC) are found in SAE J2931/4. The specification supports DC energy transfer via Forward Power Flow (FPF) from source to vehicle. SAE has published multiple documents relating to PEV and vehicle-to-grid interfaces. The various document series are listed below, with a brief explanation of each.
Standard

Communication between Wireless Charged Vehicles and Wireless EV Chargers

2015-08-05
HISTORICAL
J2847/6_201508
This SAE Recommended Practice SAE J2847-6 establishes requirements and specifications for communications messages between wirelessly charged electric vehicles and the wireless charger. Where relevant, this document notes, but does not formally specify, interactions between the vehicle and vehicle operator. This is the 1st version of this document and captures the initial objectives of the SAE task force. The intent of step 1 is to record as much information on “what we think works” and publish. The effort continues however, to step 2 that allows public review for additional comments and viewpoints, while the task force also continues additional testing and early implementation. Results of step 2 effort will then be incorporated into updates of this document and lead to a republished version. The next revision will address the harmonization between SAE J2847-6 and ISO/IEC 15118-7 to ensure interoperability.
Standard

Communication for Plug-in Vehicles as a Distributed Energy Resource

2013-12-10
HISTORICAL
J2847/3_201312
This document applies to a Plug-in Electric Vehicle (PEV) which is equipped with an onboard inverter and communicates using the Smart Energy Profile 2.0 Application Protocol (SEP2). It is a supplement to the SEP2 Standard, which supports the use cases defined by J2836/3™. It provides guidance for the use of the SEP2 Distributed Energy Resource Function Set with a PEV. It also provides guidance for the use of the SEP2 Flow Reservation Function Set, when used for discharging. It is not intended to be a comprehensive guide to the use of SEP2 in a PEV.
Standard

Communication for Plug-in Vehicles as a Distributed Energy Source

2021-03-23
HISTORICAL
J2847/3_202103
This document applies to a plug-in electric vehicle (PEV) which is equipped with an onboard inverter and communicates using IEEE 2030.5-2018. It is a supplement to the SEP2 standard, which supports the use cases defined by SAE J2836/3. It provides guidance for the use of the SEP2 distributed energy resource function set with a PEV. It also provides guidance for the use of the SEP2 flow reservation function set, when used for discharging. It is not intended to be a comprehensive guide to the use of SEP2 in a PEV. Note that in this document, SEP2 is used interchangeably with IEEE 2030.5-2018.
Standard

Communication for Smart Charging of Plug-in Electric Vehicles Using Smart Energy Profile 2.0

2019-08-20
CURRENT
J2847/1_201908
This document describes the details of the Smart Energy Profile 2.0 (SEP2.0) communication used to implement the functionality described in the SAE J2836-1 use cases. Each use case subsection includes a description of the function provided, client device requirements, and sequence diagrams with description of the steps. Implementers are encouraged to consult the SEP2.0 schema and application specification for further details. Where relevant, this document notes, but does formally specify, interactions between the vehicle and vehicle operator.
Standard

Communication for Smart Charging of Plug-in Electric Vehicles using Smart Energy Profile 2.0

2013-11-05
HISTORICAL
J2847/1_201311
This document describes the details of the Smart Energy Profile 2.0 (SEP2.0) communication used to implement the functionality described in the SAE J2836/1™ use cases. Each use case subsection includes a description of the function provided, client device requirements, and sequence diagrams with description of the steps. Implementers are encouraged to consult the SEP2.0 Schema and Application Specification for further details. Where relevant, this document notes, but does formally specify, interactions between the vehicle and vehicle operator.
Standard

Communication for Wireless Power Transfer Between Light-Duty Plug-in Electric Vehicles and Wireless EV Charging Stations

2022-10-09
WIP
J2847/6

SAE J2847/6 establishes minimum requirements for communication between an electric vehicle and an inductive battery charging system for wireless power transfer (WPT). Where relevant, this document notes—but does not formally specify—interactions between the vehicle and vehicle operator.

This document leverages the work of the SAE J2954 Alignment and Controls Sub-Team in the Wireless Power Transfer and Alignment Task Force by extending a JSON-based message set (protocol) originally developed to bench test wireless energy transfer interoperability between unmatched Ground Assembly (GA) and Vehicle Assembly (VA) systems (i.e., components manufactured by different companies). SAE J2847/6 furthers that work by adding messages sufficient to indicate that proper coil alignment has been achieved, initialize the sub-systems for wireless charging, ramp-up to full power, perform active wireless power transfer, and terminate the WPT session.

Standard

Communication for Wireless Power Transfer Between Light-Duty Plug-in Electric Vehicles and Wireless EV Charging Stations

2020-09-29
CURRENT
J2847/6_202009
SAE J2847/6 establishes minimum requirements for communication between an electric vehicle and an inductive battery charging system for wireless power transfer (WPT). Where relevant, this document notes—but does not formally specify—interactions between the vehicle and vehicle operator. This document leverages the work of the SAE J2954 Alignment and Controls Sub-Team in the Wireless Power Transfer and Alignment Task Force by extending a JSON-based message set (protocol) originally developed to bench test wireless energy transfer interoperability between unmatched Ground Assembly (GA) and Vehicle Assembly (VA) systems (i.e., components manufactured by different companies). SAE J2847/6 furthers that work by adding messages sufficient to indicate that proper coil alignment has been achieved, initialize the sub-systems for wireless charging, ramp-up to full power, perform active wireless power transfer, and terminate the WPT session.
Standard

Digital Communications for Plug-in Electric Vehicles

2012-09-07
HISTORICAL
J2931/1_201209
This SAE Information Report SAE J2931 establishes the requirements for digital communication between Plug-In Vehicles (PEV), the Electric Vehicle Supply Equipment (EVSE) and the utility or service provider, Energy Services Interface (ESI), Advanced Metering Infrastructure (AMI) and Home Area Network (HAN). This is the second version of this document and completes the step 2 effort that specifies the digital communication protocol stack between Plug-in Electric Vehicles (PEV) and the Electric Vehicle Supply Equipment (EVSE). The purpose of the stack outlined in Figure 1 and defined by Layers 3 to 6 of the OSI Reference Model (Figure 1) is to use the functions of Layers 1 and 2 specified in SAE J2931/4 and export the functionalities to Layer 7 as specified in SAE J2847/2 (as of August 1, 2012, revision) and SAE J2847/1 (targeting revision at the end of 2012).
Standard

Digital Communications for Plug-in Electric Vehicles

2014-12-11
HISTORICAL
J2931/1_201412
This SAE Information Report SAE J2931 establishes the requirements for digital communication between Plug-In Electric Vehicles (PEV), the Electric Vehicle Supply Equipment (EVSE) and the utility or service provider, Energy Services Interface (ESI), Advanced Metering Infrastructure (AMI) and Home Area Network (HAN). This is the third version of this document and completes the effort that specifies the digital communication protocol stack between Plug-in Electric Vehicles (PEV) and the Electric Vehicle Supply Equipment (EVSE). The purpose of the stack outlined in Figure 1 and defined by Layers 3 to 6 of the OSI Reference Model (Figure 1) is to use the functions of Layers 1 and 2 specified in SAE J2931/4 and export the functionalities to Layer 7 as specified in SAE J2847/2 (as of August 1, 2012, revision) and SAE J2847/1 (targeting revision at the end of 2012).
Standard

Dynamic Wireless Power Transfer for both Light and Heavy Duty Vehicles (SAE RP J2954/3)

2023-04-20
WIP
J2954/3
The SAE J2954 standard establishes an industry-wide specification that defines acceptable criteria for Light Duty EVs and SAE RP J2954/2 establishes the same for Heavy Duty. SAE RP SAE J2954. SAE RP J2954/3 establishes interoperability, electromagnetic compatibility, EMF, minimum performance, safety, and testing for dynamic wireless power transfer (D-WPT) of both light and heavy duty plug-in electric vehicles. The specification defines various charging levels that are based on the levels defined for SAE J1772 conductive AC charge levels as SAE J2954/1 & SAE J2954/2 with some variations. A standard for WPT based on these charge levels enables selection of a charging rate based on vehicle requirements, thus allowing for better vehicle packaging and ease of customer use. SAE J2954/3 addresses unidirectional charging, from grid to vehicle; bidirectional energy transfer may be evaluated for a future standard.
Standard

Electric Vehicle Battery Abuse Testing

1999-03-11
HISTORICAL
J2464_199903
This SAE Recommended Practice is intended as a guide toward standard practice and is subject to change to keep pace with experience and technical advances. It describes a body of tests which may be used as needed for abuse testing of electric or hybrid electric vehicle batteries to determine the response of such batteries to conditions or events which are beyond their normal operating range. This document is derived from a similar document originally developed by the U.S. Advanced Battery Consortium. (See 2.2.1.)
Standard

Electric Vehicle Charging Adapter Safety and OEM Qualified Device Designation

2023-12-01
WIP
J3400/1
This document covers the general physical, electrical, functional, and performance requirements for adapters connected to standards conforming conductive power transfer via handheld conductive coupler capable of transferring either DC or single-phase power using two current-carrying contacts. The focus is on defining the process to evaluate the suitability of adapters to SAE J3400 vehicle inlets.
Standard

Electric Vehicle Power Transfer System Using Conductive Automated Connection Devices

2023-05-05
CURRENT
J3105_202305
This document covers the general physical, electrical, functional, testing, and performance requirements for conductive power transfer, primarily for vehicles using a conductive ACD connection capable of transferring DC power. It defines conductive power transfer methods, including the infrastructure electrical contact interface, the vehicle connection interface, the electrical characteristics of the DC supply, and the communication system. It also covers the functional and dimensional requirements for the vehicle connection interface and supply equipment interface. New editions of the documents shall be backwards compatible with the older editions. There are also sub-documents which are identified by a SAE J3105/1, SAE J3105/2, and SAE J3105/3. These will be specific requirements for a specific interface defined in the sub-document.
Standard

Electric Vehicle Power Transfer System Using Conductive Automated Connection Devices

2020-01-20
HISTORICAL
J3105_202001
This document covers the general physical, electrical, functional, testing, and performance requirements for conductive power transfer, primarily for vehicles using a conductive ACD connection capable of transferring DC power. It defines conductive power transfer methods, including the infrastructure electrical contact interface, the vehicle connection interface, the electrical characteristics of the DC supply, and the communication system. It also covers the functional and dimensional requirements for the vehicle connection interface and supply equipment interface. There are also sub-documents which are identified by a SAE J3105/1, SAE J3105/2, and SAE J3105/3. These will be specific requirements for a specific interface defined in the sub-document. SAE J3105: Main document, including most requirements. ○ SAE J3105/1: Infrastructure-Mounted Cross Rail Connection ○ SAE J3105/2: Vehicle-Mounted Pantograph Connection ○ SAE J3105/3: Enclosed Pin and Socket Connection
Standard

Electric Vehicle Power Transfer System Using Conductive Automated Connection Devices Infrastructure-Mounted Pantograph (Cross-Rail) Connection

2023-05-05
CURRENT
J3105/1_202305
This document details one of the connections of the SAE J3105 document. The connections are referenced in the scope of the main document SAE J3105. SAE J3105/1 details the infrastructure-mounted pantograph, or cross-rail connection. All the common requirements are defined in the main document; the current document provides the details of the connection. This document covers the connection interface relevant requirements for an electric vehicle power transfer system using a conductive automated connection device (ACD) based on a cross-rail design. To allow interoperability for on-road vehicles (in particular, buses and coaches), one configuration is described in this document. Other configurations may be used for non-standard applications (for example, mining trucks or port vehicles).
Standard

Electric Vehicle Power Transfer System Using Conductive Automated Connection Devices Vehicle-Mounted Pantograph (Bus-Up)

2023-05-05
CURRENT
J3105/2_202305
This document details one of the connections of the SAE J3105 document. The connections are referenced in the scope of the main document SAE J3105. SAE J3105/2 details the vehicle-mounted pantograph, or the bus-up connection. All the common requirements are defined in the main document; the current document provides the details of the connection. This document covers the connection interface relevant requirements for an electric vehicle power transfer system using a conductive automated charging device based on a conventional rail vehicle pantograph design. To allow interoperability for on-road vehicles (in particular, buses and coaches), one configuration is described in this document. Other configurations may be used for non-standard applications (for example, mining trucks or port vehicles).
X