Fitting Assembly - 24° Cone Flareless per AS5827, 5080 psi, Port Connection, Port Preparation, Installation and Removal of AS5550 and AS5865
AS5551B
This SAE Aerospace Standard (AS) establishes the requirements for port preparation, installation, and removal procedure for AS5550 fitting assembly and AS5865 fitting reducer assembly, and is applicable when specified on engineering drawings, or in procurement documents.
Rationale:
Port preparation tooling consolidated into Table 3C. Addition of alternate tooling numbers in Tables 1B, 2B, and 3C. Correct Table 2A, Port Number 24 Installation Torque to 1900 through 2100 lbf.in. Add user definition requirement if torque values desired are other than those listed in Tables 1A or 2A. Update Section 5 to improve port cavity definition. Update 6.2.4 and 7.2.4 to recognize use of the sealants/primers and discourage use of Zinc Chromate primer. Update 6.2.5 and 7.2.5 for installation torque limits. Correction of references.
Related Topics:
Hydraulic fluids
Assembling
Fuel tanks
Identification numbers
Adhesives and sealants
Drilling
Fittings
Fastening
Hand
Also known as: SAE AS 5551
SAE MOBILUS
Subscribers can view annotate, and download all of SAE's content.
Learn More »