Browse Standards AS6124
WIP 2012-01-17

Aluminum Axially Swaged Fittings, Installation and Inspection Procedure AS6124

This procedure establishes the instructions to prepare tube ends, install and inspect axially swaged permanent tube fittings qualified to AS6116. This procedure is applicable when specified on the engineering drawing or in the procurement document.
Currently unavailable for purchase at this time

This Standard is currently a WIP.

X