Browse Standards AS683B
Historical Reaffirmed 1995-05-01

Installation Procedures and Torques for Fluid Connections AS683B

These procedures cover the following: Par. 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket. Par. 4 - Boss end connections, positioned type, with back-up ring. Par. 5 - Boss end connections, positioned type, without back-up ring. Par. 6 - Boss end connections, non-positioned type. Par. 7 - Bulkhead connections. All parts with lockwire holes shall be lockwired per AS567.
AS683D
2012-03-01
Latest
Revised
AS683C
2006-05-04
Historical
Reaffirmed
AS683B
1995-05-01
Historical
Reaffirmed
AS683A
1976-09-01
Historical
Revised

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 18% off list price.
Login to see discount.
Special Offer: Purchase more aerospace standards and aerospace material specifications and save! AeroPaks off a customized subscription plan that lets you pay for just the documents that you neeed, when you need them.

Get Involved

Want to participate in updating this standard?

X