AS683C: Installation Procedures and Torques for Fluid Connections - SAE International
Browse Standards AS683C
Historical REAFFIRMED 2006-05-04

Installation Procedures and Torques for Fluid Connections AS683C

These procedures cover the following: Paragraph 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket. Paragraph 4 - Boss end connections, positioned type, with back-up ring. Paragraph 5 - Boss end connections, positioned type, without back-up ring. Paragraph 6 - Boss end connections, non-positioned type. Paragraph 7 - Bulkhead connections.
AS683D
2012-03-01
Latest
Revised
AS683C
2006-05-04
Historical
Reaffirmed
AS683B
1995-05-01
Historical
Reaffirmed
AS683A
1976-09-01
Historical
Revised

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 18% off list price.
Login to see discount.
Special Offer: Purchase more aerospace standards and aerospace material specifications and save! AeroPaks offer a customized subscription plan that lets you pay for just the documents that you need, when you need them.

Get Involved

Want to participate in updating this standard?

X