Browse Standards AS683
WIP 2012-01-17

Installation Procedures and Torques for Fluid Connections AS683

These procedures cover the following: Paragraph 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket. Paragraph 4 - Boss end connections, positioned type, with back-up ring. Paragraph 5 - Boss end connections, positioned type, without back-up ring Paragraph 6 - Boss end connections, non-positioned type. Paragraph 7 - Bulkhead connections.
Currently unavailable for purchase at this time

This Standard is currently a WIP.

X