Refine Your Search

Topic

Search Results

Standard

Installation Procedures and Torques for Fluid Connections

2019-10-28
CURRENT
AS683E
These procedures cover the following: Section 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket. Section 4 - Boss end connections, positioned type, with back-up ring. Section 5 - Boss end connections, positioned type, without back-up ring. Section 6 - Boss end connections, non-positioned type. Section 7 - Bulkhead connections.
X