Refine Your Search

Search Results

Viewing 1 to 2 of 2
Technical Paper

The Columbus ECLSS First Year of Operations

2009-07-12
2009-01-2414
The launch and activation of ESA's Columbus module in early 2008 marked the completion of more than 10 years of development. Since then the Columbus ECLS is operating, including its major European ECLSS assemblies such as Condensing Heat Exchanger (CHX), Condensate Water Separator, Cabin Fans and Sensors. The paper will report the experiences from the first year of operations in terms of events, failures and lessons learned. Examples of this is the description of some off-nominal situations (such as Condensate Removal and IMV Return Fan failure, and relevant troubleshooting), and the preparation to Columbus Reduced Condensation Mode, as requested by NASA in order to minimize the crew time needed to empty Condensate Water Tanks in US Lab.
Technical Paper

MPLM ECLS S/S Cabin Air Ventilation and Fire Suppression Test

1995-07-01
951529
The Mini Pressurised Logistic Module (MPLM) includes an Environmental Control and Life Support System (ECLSS), whose general purpose is to guarantee a comfortable environment for the Crew. In particular, among the functions of the ECLSS, there is the provision of a correct ventilation in the habitable area of the Module and an air flow adequate to support fire detection in powered zones. These tasks are carried out by an air ventilation system mainly composed of a fan, eight cabin diffusers and a ducting system. In addition, the ECLSS furnishes, through a dedicated distribution system, the capability to suppress fire by release of the Carbon Dioxide contained in a portable fire extinguisher.
X