Refine Your Search

Search Results

Viewing 1 to 2 of 2
Journal Article

Balancing Lifecycle Sustainment Cost with Value of Information during Design Phase

2020-04-14
2020-01-0176
The complete lifecycle of complex systems, such as ground vehicles, consists of multiple phases including design, manufacturing, operation and sustainment (O&S) and finally disposal. For many systems, the majority of the lifecycle costs are incurred during the operation and sustainment phase, specifically in the form of uncertain maintenance costs. Testing and analysis during the design phase, including reliability and supportability analysis, can have a major influence on costs during the O&S phase. However, the cost of the analysis itself must be reconciled with the expected benefits of the reduction in uncertainty. In this paper, we quantify the value of performing the tests and analyses in the design phase by treating it as imperfect information obtained to better estimate uncertain maintenance costs.
Technical Paper

Development of New Generation of Multibody System Computer Software

2013-04-08
2013-01-1192
This paper discusses a new Department of Defense (DoD) initiative focused on the development of new generation of MBS computer software that have capabilities and features that are not provided by existing MBS software technology. This three-decade old technology fails to meet new challenges of developing more detailed models in which the effects of significant changes in geometry and large deformations cannot be ignored. New applications require accurate continuum mechanics based vehicle/soil interaction models, belt and chain drive models, efficient and accurate continuum based tire models, cable models used in rescue missions, models that accurately capture large deformations due to thermal and excessive loads, more accurate bio-mechanics models for ligaments, muscles, and soft tissues (LMST), etc.
X