Browse Standards AIR5320
Historical ISSUED 1999-07-01

Summary of Icing Simulation Test Facilities AIR5320

This SAE Aerospace Information Report (AIR) contains information on most of the major icing simulation ground facilities. An effort was made to obtain data from as many facilities as possible over a two year time period. The data in this document represents the state of the facilities in calendar year 1996. Facilities are constantly changing and upgrading and, therefore, some facility specifications may change during the life of this report.
Of the 27 facilities described in this report, the primary use is split with approximately half for engine testing and half for wind tunnel testing. The facilities are limited to ground facilities and, therefore, icing tankers have not been included.
AIR5320A
2015-09-25
Latest
Stabilized
AIR5320
1999-07-01
Historical
Issued

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 10% off list price.
Login to see discount.
Special Offer: AeroPaks offers a customized subscription plan that is cost-effective and allows you to choose the number of downloads and Aerospace and Aerospace Material documents you need. Find more information here.
We also recommend:
STANDARD

Summary of Icing Simulation Test Facilities

AIR5320A

View Details

STANDARD

Test Cell Analytical Thrust Correction

AIR5436A

View Details

STANDARD

A Guide to Aircraft Turbine Engine Vibration Monitoring Systems

AIR1839D

View Details

Get Involved

Want to participate in updating this standard?

X