Aluminum Axially Swaged Fittings, Installation and Inspection Procedure
AS6124
This procedure establishes the instructions to prepare tube ends, install and inspect axially swaged permanent tube fittings qualified to AS6116. This procedure is applicable when specified on the engineering drawing or in the procurement document.