Browse Publications Technical Papers 1999-01-3360
1999-09-28

Planning Material Handling Vehicle Routes for Internal Just-In-Time Operations 1999-01-3360

The problem of supplying JIT assembly workstations from a central depot with a goal of minimizing inventory and vehicle requirements is the focus of this paper. To minimize work-in-process inventory, the quantity of component parts delivered to each workstation must be just enough to satisfy production until the next delivery of components. To minimize vehicle requirements, there should be no vehicle idle time. The problem is modeled as a vehicle routing problem with a nonlinear capacity constraint. A heuristic solution procedure is outlined and a relaxed formulation is given to provide a lower bound on the number of vehicles required.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
X