Refine Your Search

Topic

Search Results

Journal Article

Body Join Drilling for One-Up-Assembly

2013-09-17
2013-01-2296
Over 1,200 large diameter holes must be drilled into the side-of-body join on a Boeing commercial aircraft's fuselage. The material stack-ups are multiple layers of primarily titanium and CFRP. Due to assembly constraints, the holes must be drilled for one-up-assembly (no disassembly for deburr). In order to improve productivity, reduce manual drilling processes and improve first-time hole quality, Boeing set out to automate the drilling process in their Side-of-Body join cell. Implementing an automated solution into existing assembly lines was complicated by the location of the target area, which is over 15 feet (4 meters) above the factory floor. The Side-of-Body Drilling machines (Figure 1) are capable of locating, drilling, measuring and fastening holes with less than 14 seconds devoted to non-drilling operations. Drilling capabilities provided for holes up to ¾″ in diameter through stacks over 4.5″ thick in a titanium/CFRP environment.
Technical Paper

Offset Fastening Flex Track

2012-09-10
2012-01-1850
Flex Track Drilling systems have been successfully implemented into several production environments and scenarios over the past couple of years. They continue to see a high demand where traditional machine tool implementations might be prohibitive due to cost or existing jig structures. This demand for innovation has led to a unique Flex Track design termed an Offset Flex Track that not only works between the vacuum rails, but can work beyond the envelope of the rails. This allows the machine to be used in situations such as the leading edge of wings where the vacuum rails cannot straddle the work envelope. The next evolution of this Offset machine is the introduction of final fastener installation onto the head using an onboard rivet gun. In addition, the camera used to locate datum points on the fuselage is now integrated into the nose piece, eliminating the need for a tool change to a spindle mounted camera.
Journal Article

Augmented Reality and Other Visualization Technologies for Manufacturing in Boeing

2011-10-18
2011-01-2656
The Efficient Assembly, Integration & Test (EAIT) team at Boeing Research & Technology, Boeing's central technology organization, is working on multiple implementations of Augmented Reality to aid assembly at the satellite production facility in El Segundo, CA. This presentation will discuss our work to bring an Augmented Reality tool to the shop floor, integrating product design and manufacturing techniques into a synergistic backbone and how this approach can support the delivery of engineering design intent on the shop floor. The team is developing a system to bring designer's 3D CAD models to the technicians on the shop floor, and spatially register them to live camera views of production hardware. We will discuss our work in evaluating multiple motion captures systems, how we integrated a Vicon system with Augmented Reality software, and our development of a user interface allowing technicians to manipulate the graphical display.
Journal Article

Technical Improvements to the ASAT2 Boeing 777 Spar Assembly Cell

2011-10-18
2011-01-2707
Electroimpact and Boeing are improving the efficiency and reliability of the Boeing 777 spar assembly process. In 1992, the Boeing 777 spar shop installed Giddings and Lewis spar machines with Electroimpact Inc. EMR(1) (Electromagnetic Riveting) technology. In 2011, Electroimpact Inc. began replacing the original spar machines with next generation assembly machines. The new carriages incorporate a number of technical improvements and advancements over the current system. These technical advancements have facilitated a 50% increase in average cycle rate, as well as improvements to overall process efficiency, reliability and maintainability. Boeing and Electroimpact have focused on several key technology areas as opportunities for significant technical improvements.
Technical Paper

Drilling Mixed Stack Materials for the BOEING 787

2010-09-28
2010-01-1867
The new combinations such as composites and titanium that are being used on today's new airplanes are proving to be very challenging when drilling holes during manufacturing and assembly operations. Gone are the days of hand drilling with high speed steel drills through soft aluminum structure, after which aluminum rivets would be swaged into those holes with very generous tolerances. The drilling processes today need to use cutter materials hard enough and tough enough to cut through hard metals such as titanium, yet be sharp enough to resistant abrasion and maintain size when drilling through composites. There is a constant search for better cutters and drills that can drill a greater number of holes. The cost of materials used in today's aircraft is much higher. The cutting tools are more expensive and the hole tolerances are much tighter.
Technical Paper

Assembly Fixture for 787 Section 11, Heavy Composite Assembly

2007-09-17
2007-01-3869
The 787 Section 11 Assembly Cell is a combination fixed post and moving frame holding and indexing system, designed to determinately build the 787 Section 11 Wing box. The retractable overhead frame allows maximum clearance for safer and faster loading and unloading of component parts, as well as completed wingbody sections. Additionally, each index is also retractable allowing maximum fastener access inside the jig.
Technical Paper

Automated Riveting Cell for A320 Wing Panels with Improved Throughput and Reliability (SA2)

2007-09-17
2007-01-3915
A new Low-Voltage Electromagnetic Riveting (LVER) machine has entered service at the Airbus UK wing factory in Broughton, Wales, in an assembly workcell for A320 family wing panels. The machine is based on existing Electroimpact technology but incorporates numerous design modifications to process tools, fastener feed hardware, machine structure and the control system. In the first months of production these modifications have demonstrated clear improvements in fastener installation cycle times and machine reliability.
Technical Paper

Robotic Drilling System for 737 Aileron

2007-09-17
2007-01-3821
Boeing's wholly owned subsidiary in Australia, Hawker de Havilland produces all ailerons for the Boeing 737 family of aircraft. Increasing production rates required to meet market demand drove the requirements for a new updated approach to assembly of these parts. Using lean principals, a pulsed flow line approach was developed. A component of this new line is the integration of a flexible robotic drilling/trimming system. The new robotic system is required to meet aggressive tack time targets with high levels of reliability. The selected system was built on a Kuka KR360-2 conventional articulated arm robot. A significant challenge of this project was the requirement for the process head to work efficiently on an aileron in an existing jig. As a result a new side-mounted drill and trim end effector was developed. Automated tool changers for both cutters and pressure foot assemblies eliminated the requirement for in- process manual intervention.
Technical Paper

Medium Wave Infrared Heater for High-Speed Fiber Placement

2007-09-17
2007-01-3842
Electroimpact, in cooperation with a large airframe manufacturer, has developed Automated Fiber Placement equipment capable of depositing material at speeds in excess of 2000 inches per minute. As the machine lays down each new ply of material, the area forward to machine motion is heated just in advance of pressing the tape against the substrate. A fast-reacting, high-power infrared emitter heats this area quickly and safely. The design of these heaters is the subject of this paper.
Technical Paper

Simply Supported Retractable Top Beam for Wing Major Assembly Jig

2006-09-12
2006-01-3127
A large free-standing structure is constructed to positively position the spar and related components in the major assembly jig of the wing for a military transport aircraft. The beam of this structure is mounted on mechanisms enabling the lateral retraction of the beam and tooling to provide full part loading access and extraction of a completed wing. The free-standing nature of this design also allows full integration of an automated drilling machine into the jig.
Technical Paper

Evaluation of the EMR for Swaging Collars on Advanced Composite Laminates

2005-10-03
2005-01-3299
The Boeing 787 Dreamliner will be the most fuel-efficient airliner in the world when it enters service in 2008. To help achieve this, Boeing will utilize state-of-the-art carbon fiber for primary structures. Advanced manufacturing techniques and processes will be used in the assembly of large composite structures. Electroimpact has proposed a system utilizing the low recoil Low Voltage Electromagnetic Riveter (LVER) to drill and install bolts. A test program was initiated between Boeing Materials Process and Engineering (MP&E) and Electroimpact to validate the LVER process for swaging titanium collars on titanium pins in composite material. This paper details the results of these tests.
Technical Paper

HAWDE Five Axis Wing Surface Drilling Machine

2004-09-21
2004-01-2806
The Horizontal Automated Wing Drilling Equipment (HAWDE) machine is an enabling technology for automated drilling of large aircraft parts. HAWDE is a five axis drilling machine that operates over the upper and lower surfaces of eight wings, each more than 40 meters long and four stories tall. The machine accesses the entire A380 wing using a combination of elevators and a machine transporter that carries the machine from surface to surface. HAWDE drills holes in spars, butt splices, and rib feet in the wing box final assembly jigs for A380.
Technical Paper

A Selected Operational History of the Internal Thermal Control System (ITCS) for International Space Station (ISS)

2004-07-19
2004-01-2470
The Internal Thermal Control System (ITCS) has been developed jointly by Boeing Corporation, Huntsville, Alabama and Honeywell Engines & Systems, Torrance, California to meet the internal thermal control needs for the International Space Station (ISS). The ITCS provides heat removal for the critical life support systems and thermal conditioning for numerous experiment racks. The ITCS will be fitted on a number of modules on the ISS. The first US Element containing the ITCS, Node 1, was launched in December 1998. Since Node 1 does not contain a pump to circulate the fluid it was not filled with ITCS fluid until after the US Laboratory Module was installed. The second US Element module, US Laboratory Module, which contains the pumps and all the major ITCS control hardware, was launched in February 2001. The third US Element containing the ITCS, the US Airlock, was launched in July 2001.
Technical Paper

ESM History, Capability, and Methods

2003-07-07
2003-01-2630
Equivalent system mass (ESM) was defined in 1997 as an integral part of the Advanced Life Support project metric. It is particularly suited to comparing technologies that differ in mass, volume, power, cooling, and crew time during the early phases of a program. In principle, ESM can also be used to compare technologies that differ in other parameters. In practice, the necessary data is generally not available, and this limits this application. ESM has proven to be a useful tool. Like any tool, its strengths and weaknesses must be understood. This paper documents the history, capability and methods used in connection with ESM.
Technical Paper

Enhanced Security Flight Deck Doors-Commercial Airplanes

2002-11-05
2002-01-2998
In the wake of the 9/11/2001 hijacking events, the Federal Aviation Administration (FAA) has emphasized the need for enhanced flight deck doors on commercial airplanes. The paper describes enhanced flight deck door, which meets the new FAA requirements for intrusion resistance and ballistic protection. In addition, the new door meets the existing requirements for rapid decompression, flight crew security and rescue.
Technical Paper

Method of Accurate Countersinking and Rivet Shaving

2001-09-10
2001-01-2569
Wing skin riveting and bolting requires the surface to be flush to +/–.025mm(.001″) to produce an acceptable finish. Using the method described in this paper, automated wing riveting technology and panel assembly techniques can achieve better shave height and countersink accuracies than have previously been possible in production.
Technical Paper

Electric 30,000 RPM Shave Spindle for C Frame Riveter and High Performance Compact Aerospace Drill

2000-09-19
2000-01-3017
Two spindles are discussed in this paper. The first spindle was installed on nine C-frame riveters on the 737/757 wing line at the Boeing Renton facility. Due to discontinuing the use of Freon coolant and cutting fluid, the C-frame riveters had difficulty shaving 2034 ice box rivets with the existing 6000 RPM hydraulic spindles. The solution was to install electric 30,000 RPM shave spindles inside the existing 76.2 mm (3 in.) diameter hydraulic cylinder envelope. The new spindle is capable of 4 Nm (35 in. lbs.) of torque at full speed and 110 kgf (250 lbs.) of thrust. Another design of interest is the Electroimpact Model 09 spindle which is used for 20,000 RPM drilling and shaving on wing riveting systems. The Model 09 spindle is a complete servo-servo drilling system all mounted on a common baseplate. The entire spindle and feed assembly is only 6.5″ wide.
Technical Paper

Automated Wing Panel Assembly for the A340-600

2000-09-19
2000-01-3015
The Airbus A340-600 wing panel manufacturing system, which entered production in 1999, represents a major milestone for automated aircraft assembly. The new A340-600 system builds upon the success of the E4000 based A320 wing panel assembly system, which was introduced into production three years ago. The new A340-600 system consists of two 440 ft. assembly lines. One produces upper wing skin panels and the second produces lower skin panels. Each line consists of three fully automated CNC controlled flexible fixtures placed end to end serviced by two E4100 CNC assemble machines. Each fixture accepts multiple wing panels and can be automatically changed between the different configurations. Stringers are located and held using clamps mounted to “popping posts”. These posts automatically drop out of the machine path into the floor to provide clearance for complete stringer to skin fastening.
Technical Paper

Lockbolt Qualification Testing for Wing Panel Assemblies

2000-09-19
2000-01-3023
This paper gives an outline of testing carried out in conjunction with Electroimpact to support the introduction of the A319/A320/A321 and A340-500/600 Panel Assembly Cells in Broughton, UK. Testing compared the percussion insert/EMR swaging of lockbolts with existing hydraulic installation methods. Tests included pre-load tension tests, ultimate tension load tests, tension fatigue tests, high-load lap shear fatigue tests, static lap shear tests, a pressure leak test, and metallurgical examination. Fastener configurations tested covered diameters from 1/4, 5/16, 3/8, and 7/16 of an inch. Joint materials conformed to ABM3-1031 (7150-T651 plate), stump-type lockbolts to ABS0550VHK (Huck LGPS4SCV), and collars to ASNA2025 (Huck 3SLC-C). Some pull-type lockbolts to ABS0548VHK (Huck LGPL4SCV) were also tested as noted.
Technical Paper

Wing Assembly System for British Aerospace Airbus for the A320

1998-09-15
982151
British Aerospace needed an automated wing riveting system for fastening the A320 wing sections. The E4000 Wing Riveting System was designed and installed at their Airbus factory in Chester, UK and is now in production. It uses a five axis solid yoke with workheads on each end of the yoke. It accurately installs both rivets and lockbolts over the entire wing panel, including offset areas.
X