Refine Your Search

Search Results

Viewing 1 to 2 of 2
Technical Paper

MPLM Total Off-Gassing Test Through Different Sampling Methods: Comparison and Experimental Results

2001-07-09
2001-01-2244
The Total Off-gassing test purpose is to determine the identity and quantity of trace gas contaminants offgassed in areas of spacecraft where the crew will breathe the atmosphere. Two different air sampling methods were adopted in parallel during the off-gassing tests on the Multi-Purpose Logistics Modules (MPLM) by Alenia Spazio. The first method, based on NASA (National Aeronautics and Space Administration) requirements, foresees storage of collected air samples into stainless steel pressure cylinders. The second method proposed by ESA (European Space Agency), uses trace contaminants adsorption on Carbopack™ filled ceramic tubes. Sample lines route the samples collected inside the MPLM cabin, to the respective external collection points. Successively, the stored samples are chemically analyzed by Gas Chromatography / Mass Spectrometry (GC/MS) techniques and the module offgassing rates are calculated.
Technical Paper

Architecture of the Environmental Control System for the Mini Pressurised Logistics Module

1994-06-01
941309
The Mini Pressurised Logistics Module (MPLM), a cooperative project between NASA and ASI that will be designed, developed, produced, integrated and delivered by Alenia, is a pressurised volume devoted to the resupply and return of Space Station (SS)containerized cargo requiringapressurised environment, via the National Space Transportation System (NSTS). As a servicer for the SS, the MPLM will have to accomplish several trips between Earth and SS in support of logistic needs. Since the active payloads launched with MPLM (freezers and refrigerators) require resources during the transportation phase inside the NSTS, the MPLM has the peculiar capacity to exchange power, data and fluids with the Orbiter before docking to SS. Once docked to SS, the MPLM will be required to provide its full performance, making use of the resources available from the SS Node; nevertheless, in this phase some of the MPLM functions are demanded from the SS.
X