Refine Your Search

Topic

Search Results

Article

Quality management experts provide guidance on AS9100 standard

2021-11-04
Quality management professionals across the global aerospace and defense community are convening for one hour – Wednesday, October 27th, starting at 10 am Pacific Daylight Time (PDT) – to discuss the AS9100 international standard. Register to take part in the free AeroTech webinar, hosted by SAE International and Tektronix, designed to help manufacturers, contractors, and subcontractors throughout the global aviation, space, and defense supply chain keep pace with and meet the requirements of AS9100 international quality management system standard.
Article

Lockheed Martin announces latest hypersonic progress at Le Bourget

2019-06-17
Lockheed Martin successfully flight tested the AGM-183A Air-Launched Rapid Response Weapon (ARRW) on a U.S. Air Force Boeing B-52 Stratofortress. The captive carry flight – announced during the 2019 International Paris Air Show – marks Lockheed Martin’s most recent demonstration of hypersonic technology development.
Article

Lockheed Martin validates heatshield for the Mars 2020 rover mission

2019-05-07
Lockheed Martin Corporation successfully completed development and testing for the heatshield that will protect NASA Jet Propulsion Laboratory Mars 2020 rover during its descent to the Martian surface. After completing the flight hardware structure, Lockheed Martin tested the heatshield’s physical integrity by exposing it to ‘flight-like’ thermal conditions.
Article

Maintainers design a $400 maintenance fixture to save the U.S. Air Force $500k per year

2019-04-30
A cowling, or engine cover, is a critical airframe component that reduces drag and directing airflow into the engine. For the E-8C JSTARS, an aircraft with four massive Pratt and Whitney JT3D-based TF33-102C turbofan engines, each set of engine cowling components can cost up to $80,000 per set. Even a slightly warped cowling renders the entire housing unsafe and unserviceable.
Article

Final Orion capsule parachute system test successful

2018-09-28
A team of engineers from NASA and Dallas-based Jacobs Engineering Group Inc. successfully completed the eighth and final test of the Orion spacecraft Capsule Parachute Assembly System at the U.S. Army Yuma Proving Ground in Yuma, Ariz.
Article

Tooling decisions play major role in cost, turnaround time

2018-07-24
“Laddering up” of the range of tooling options requires assessing at each plateau whether greater upfront investment in tooling will pay off with a relatively quick return on investment. Since tooling plays such a key role in this equation, it also means working closely with OEMs willing to evaluate the best available tooling options at any time as production requirements increase.
Article

Boeing debuts first hypersonic passenger aircraft concept

2018-06-29
Officials and engineers at Boeing in Seattle are offering a glimpse into their vision for hypersonic air travel. They have released, for the first time, images of one of the company’s hypersonic air vehicle concepts for potential military and commercial passenger transport.
X