Refine Your Search

Search Results

Viewing 1 to 2 of 2
Technical Paper

Optimum design of a Tractor hydraulics system by innovative material development and Correlation with physical testing

2023-04-11
2023-01-0877
The tractor usage is growing in the world due to derivative of rural economy and farming process. It needed wide range of implements based on the applications of the customer. The tractor plays a major role in Agricultural and Construction applications. In a tractor, hydraulic system is act as a heart of the vehicle which controls the draft and position of the implement. Hydraulic system consists of Powertrain assembly, 3-point linkage and DC sensing assembly. The design of hydraulic powertrain assembly is challenging because the loads acting on the system varies based on the type of implement, type of crop, stage of farming and soil conditions etc., Hydraulic powertrain assembly is designed based on standards like IS 12207-2019 which regulates the test methods for the system based on the lift capacity of the tractor. In this paper, virtual simulation has been established to optimize the design and perform the test correlation.
Technical Paper

Engineering Failure Analysis Methodology & Influence of Spline Cutting Method in Torsional Life Improvement in Tractor Axle Application

2023-05-25
2023-28-1318
The Tractors are inevitable in the world due to its remarkable contribution majorly in farming process and other applications. the farming equipment needs to perform multiple applications to enhance the productivity and increased horsepower demands all-wheel drive (Refer fig. 1) or four-wheel drive option in the tractor. So, it is becoming a mandatory feature. The main objective of this study is, improving the torsional fatigue life in front axle spindle shaft by modifying the spline design and optimizing induction hardening heat treatment process in such a way that the other part of the system will have a minor or no design change. It helps us to reduce the part count variability, lower manufacturing cost and development time.
X