Refine Your Search

Topic

Search Results

Technical Paper

Temperature Control Analysis for the U.S. Lab, Node 1, and Elements Attached to Node 1

1997-07-14
972564
The International Space Station (ISS) Temperature and Humidity Control (THC) system has been designed with the intent of supplying the air cooling needs of various elements from the U.S. Lab heat exchanger assembly. Elements without independent air cooling capability are known as “parasitic” elements; these are Node 1, the Cupola, and the Mini Pressurized Logistics Module (MPLM). Analysis results are presented which show expected temperatures in the MPLM, and Node 1, as various heat loads are present in the respective elements. Analyses within this paper are coordinated with the results obtained from the Development Test of the complex USL/Node 1 integrated ducting system. This test was conducted in the summer of 1995, at the McDonnell Douglas test facility in Huntington Beach, California.
Technical Paper

Space Station THC/IMV Development Test/Analysis Correlations and Flight Predictions

1997-07-14
972565
The International Space Station (ISS) Temperature and Humidity Control/Intermodule Ventilation (THC/IMV) system for the U.S. Lab provides required cooling air for the U.S. Lab and also provides “parasitic” cooling air for Node 1 and its attached elements. This scheme provides cooled air from the Lab THC directly to Node 1 and also to elements attached to Node 1, at different stages of Space Station assembly. A development test of the U.S. Lab and Node 1/attached elements' integrated THC/IMV ducting system was performed in the summer of 1995. This test included the U.S. Lab's development level Common Cabin Air Assembly (CCAA), which removes sensible and latent heat from the circulated and ducted cabin air. A referenced 1996 ICES Paper contains the initial correlation results. An analytical model has been developed, which has been used to predict flow and pressure drop performance of the system for several potential and actual changes from the Development Test configuration.
Technical Paper

Evolution to Lean Manufacturing A Case Study of Boeing of Spokane

1997-06-03
972235
The evolution of a manufacturing organization toward “Lean” manufacturing does not necessarily come cheaply or quickly. It is the experience at Boeing that technology and different visions can dramatically impact the evolutionary process-consuming great amounts of time and resources. The Boeing of Spokane case study, where aircraft floor panels are manufactured1, is but one of several case studies that suggests moving to “Lean” manufacturing is usually done in large steps, not small ones. These initial steps can be costly unless the systems (equipment and workforce) are flexible. Workforce flexibility is dependent on the attitude in the workforce as both touch and support labor move from their comfort zone to try new approaches and job descriptions. The workforce must be properly motivated to make the change. The equipment must also be flexible in adapting to new line layouts, product mixes, and process change or large cost penalties will be incurred.
Technical Paper

Gaugeless Tooling

1998-09-15
982147
At The Boeing Company, the advent of a Determinant Assembly (DA) program and the subsequent production of accurate fuselage subpanels created a need to be able to position subpanels accurately and repeatably during fuselage assembly. The tool engineering organization of The Boeing Company and Advanced Integration Technology, Inc. (AIT) as the prime contractor, are developing and installing automated positioning and alignment systems throughout major 747 fuselage assembly areas which enable DA techniques. The benefits of this assembly approach and this automated precision tooling are flexibility, assembly accuracy, ease of assembly and associated speed, reduced downtime for tool maintenance, and improved shop-floor ergonomics.
Technical Paper

Machine Readable Coding of 777 Wing Fastening Systems Tooling

1998-09-15
982133
This paper presents a detailed overview of the advantages and benefits of using 2-D barcodes, called Data Matrix codes, on Wing Fastening System (WFS) Tooling. This project was conducted on, but not limited to, the 777 Wing Fastening System (GEMCOR) tooling including the drills, fingers, and button dies. This paper will show how using Data Matrix codes to identify tooling will: Eliminate excessive downtime due to the operator using the incorrect tooling for a given tool setup. Reduce the cost associated with panel rework due to the use of incorrect tooling. Reduce the cost associated with excessive tool inventory or last minute ordering to keep up with production needs. Track tool life information for each specific tool. Provide operators with an easy to use tool setup reference document. And provide the factory with the ability to trace panel damage or defects back to the specific machine and exact tooling used.
Technical Paper

EVA Operations Using the Spacelab Logistics Pallet for Hardware Deliveries

2001-07-09
2001-01-2201
There are a large number of space structures, orbital replacement units (ORUs) and other components that must be transported to orbit on a regular basis for the assembly and maintenance of the International Space Station (ISS). Some of this hardware will be ferried on the Spacelab Logistics Pallet (SLP), which has a long and reliable history of space flight successes. The carrier is well used, well qualified, and very adaptable for repeated use in accommodating cargoes of various sizes and shapes. This paper presents an overview of past, present and future hardware design solutions that accommodate EVA operations on the SLP. It further demonstrates how analysis techniques and design considerations have influenced the hardware development, EVA operations, and compliance with human engineering requirements for the SLP.
Technical Paper

Specification Reform of Avionics Thermal Design Criteria – An F-15 Case Study

2001-07-09
2001-01-2156
Traditional thermal design criteria for avionics equipment are reviewed. Several studies have recently been conducted on the F-15 to assess accuracy of these design criteria. An overview of the study approach and results are presented. Specific topics investigated include: emergency cooling air provisions, cold start-up, hot start-up, normal and transient bay temperatures, and altitude design. The results indicate that many existing design criteria are overly conservative. The study findings suggest that reform of the existing thermal specification process is needed. Many of these reforms are applicable to the general aerospace industry and may result in significant acquisition cost savings as a result of the trend toward usage of commercial electronic parts. The reforms suggested include a new performance based thermal specification approach that increases emphasis on aircraft usage and frequency of occurrence. New transient design criteria are also recommended.
Technical Paper

An Investigation into the Use of Small, Flexible, Machine Tools to Support the Lean Manufacturing Environment

2001-09-10
2001-01-2566
Drilling fastener holes in large assemblies is traditionally accomplished through the use of large machine tools in order to obtain the accuracies required for the assembled part. Given recent advances of machine design and machine controller compensation, the accuracy of the motion platform can be corrected if the machine is repeatable. This coupled with the use of a vision system or touch probe to compensate for assembly variations, permit the use of smaller, more portable drilling systems. These smaller, more portable machine tools allow for lean manufacturing techniques to be incorporated into build processes, utilize less floor space, and in many cases are less costly than larger, permanent machine tools. This paper examines the feasibility of utilizing a small 5-axis, portable, drilling system for drilling the side panel skins on the F/A-18 E/F forward fuselage.
Technical Paper

F/A-18 E/F Outer Wing Lean Production System

2001-09-10
2001-01-2608
The Boeing F/A-18 E/F Program Wing Team, Lean Organization and Phantom Works have partnered to develop a “state of the art” lean production system for the Outer Wing that represents an evolutionary change in aircraft design and assembly methodology. This project is focused on improving quality, cycle and cost performance through the implementation of lean principles, technology integration and process improvements. This paper will discuss the approach taken to reach the end state objectives and the technologies and processes being developed to support it. Items to be discussed include lean principles and practices, new tooling concepts, improved part assembly techniques, advanced drilling systems, process flow enhancements and part handling/part delivery systems.
Technical Paper

Machined Component Quality Improvements Through Manufacturing Process Simulation

2001-09-10
2001-01-2607
New manufacturing technologies such as high speed machining (HSM) are being developed to produce high quality aerospace components. While our developing understanding of machining dynamics is enabling precise control of cutting tools to provide for high dimensional accuracy, residual stresses present in aluminum mill products can compromise the ability to machine dimensionally accurate components from these stock materials. The advantages of precise tool control can be lost if the metal being cut moves during machining. And, even a perfectly machined part that distorts when it is released from the machine bed will cause problems upon assembly. Thus, ensuring the quality of the mill product becomes an enabling technology for advanced manufacturing approaches such as HSM.
Technical Paper

A Preliminary Dynamic Model of Brake Friction Using Pressure and Temperature

2001-10-28
2001-01-3150
Understanding the friction behavior of brake lining materials is fundamental to the ability to predict brake system performance. Of particular interest to the aviation community, where carbon/carbon composite heatsinks are commonly used, is the aircraft response at deceleration onset. There are two performance measures defining brake system performance at braking onset: deceleration onset rate and system response time. The latter is strictly a function of the brake system hydraulics and is not affected by brake lining friction. The former performance measure is a function of both system hydraulics and brake lining friction. Previously to the work herein, carbon heatsink friction was thought to be unpredictable at braking onset. That being the case, a predictive capability for deceleration onset rate was not previously undertaken. This meant that assessment of this performance measure waited until aircraft taxi tests were performed.
Technical Paper

Process Automation Through-Reality Graphics, Kitting, and Automated Panel Protection

1997-09-30
972806
This paper addresses process improvements through reality graphics (RG) aided by automated panel protection (APP) and tool kitting pertaining to automated wing riveting and fastening. This system provides an integrated display of numerical controlled media, automatic tool identification, and image files, combined with automated panel protection. Reality graphics (image files) within the NC program allow the machine operator to access portions of the NC program while attaching a support graphic. This would include safety hazards, unique panel differences, program start, and tool change information. Automated panel protection (APP) analyze process key characteristics, and perishable tool kits, and it monitors the installation of fasteners using multiple cameras mounted in strategic positions, taking real-time images. The APP detects incorrect tooling and possible panel damage, with little or no impact to the operational cycle time of the automated fastening equipment.
Technical Paper

U.S. Lab-A Module Cabin Air Distribution in Space Station

1993-07-01
932192
This paper presents the basic test data obtained from tests of a cabin air distribution system in a simulated Space Station U.S. Lab-A module. The cabin air distribution system controls the flow of air in the open space of a Space Station module. In order to meet crew comfort criteria the local velocities for this cabin air are required to be distributed within a specified range with upper and lower limits. Achieving this desired velocity distribution is dependent upon the: (1.) design of the cabin air supply equipment and cabin air return equipment, (2.) total flowrate of air supplied to and subsequently returned from the cabin, and (3.) interactive effects of any other additional air flow streams which enter and exit the cabin. The basic Space Station design for the cabin air supply and air return equipment was used in this test program. Only directional adjustments to vanes in supply air diffusers were made during the test.
Technical Paper

ETOPS and Service Ready Standards and Processes

1992-10-01
921919
A review of the current extended-range twin-engine operations (ETOPS) and the modifications to the standards and processes that led to its successful operational record has contributed to the feasibility of developing an airplane and preparing an operator for ETOPS at entry into service. The airplane and engine manufacturers and component suppliers have continued to expand on these modified standards and processes in their design, build, test and support programs to meet regulatory authority ETOPS requirements and to facilitate the development of regulatory authority criteria for substantiating ETOPS capability prior to entry into service. Airlines, in conjunction with the manufacturers, have also developed improved processes that meet regulatory authority requirements for preparing an operator to integrate a new airplane into its existing ETOPS programs at entry into service.
Technical Paper

Modular Rack Design for Multiple Users

1994-06-01
941587
The Space Station program was faced with a unique design environment-to design a common systems and payload support structure that could accommodate changeout for repair or technology growth over a 30-year lifetime. The vibration environment and weight allocation for rack structure necessitated a lightweight, yet stiff structure. The design answer was a modular rack structure using graphite/epoxy composites and selected aluminum components that could support a wide variety of systems, payload and stowage functions. A modular set of mounting locations allow the installation of a wide variety of secondary structures without permanent modifications to the rack. Aircraft-style seat track rails on the front edges of the rack permit attachment of handrails, foot restraints and accessories such as lights, fans, clipboards or computers to the rack face.
Technical Paper

Development of Fatigue-Rated 7/16 Inch Diameter Flush-Head Rivets for Aluminum Wing Structure

1995-09-01
952170
A hydraulic squeeze riveting process has been developed which yields high fatigue quality for large diameter rivets in aluminum wing structure. The process for installation of 7/16 inch diameter 2017-H15 aluminum alloy flush head rivets was developed using a series of statistically designed experiments. Factors such as rivet geometry, die shape, and upset force were varied to yield optimal rivet interference. The relationship between interference and fatigue life was quantified. The development process described provides a case study for those working to optimize complex multivariate manufacturing processes.
Technical Paper

Noise Implications for VTOL Development

1970-02-01
700286
Noise from the aircraft may prevent the establishment of VTOL ports near population centers-the locations which can provide a significant contribution to mass transportation. To determine how annoying these aircraft may be, a total community annoyance measure (TCAM) has been developed. The TCAM can indicate flight trajectories which minimize the annoyance of the aircraft and the type of aircraft which are acoustically acceptable for operations from a V/STOL port. Low disc loading rotors seem best for operation near terminals while low tip speed propellers are best for cruise.
Technical Paper

Potentials for Advanced Civil Transport Aircraft

1973-02-01
730958
In this lecture, a review of Boeing commercial transport models is presented in chronological order from the B-1 flying boat of 1919 to the 747. The problems of air transport systems including convenience, reliability, safety, comfort, performance, and financial and environmental costs are discussed. The probability of more severe future problems is considered, and suggestions are offered as to technology and system improvements which may need to be pursued if civil air transport systems are to continue to provide fast, convenient transportation with a high level of public acceptance.
Technical Paper

Composite Structure for Orbiting Space Stations

1964-01-01
640291
An overview of composite structure required for manned orbiting space stations is presented. Following a brief introduction of typical configurations and major subsystems, the major structural areas requiring composite structure and their particular functions and requirements are discussed. A summary weight breakdown is presented to assess the dependence of launch weight on these areas. To illustrate, the primary wall composite structure is presented in detail. The design interplay of boost, pressure, meteoroid, radiation, and thermal control requirements are presented. Resultant composite structure for each remaining major structural area is presented in summary form with a brief description of typical design compromises required.
Technical Paper

Incipient Failure Detection - The Detection of Certain Contaminating Processes

1967-02-01
670633
Three separate and distinct electrolytic and one galvanic process were identified by visual inspection, metallographic, electron microprobe, and x-ray diffraction analysis in a clocked, flip-flop integrated circuit flat pack and/or the associated printed circuit test jig (two on flat pack and two on circuit board). These four processes were all found to be detectable by the use of noise measurements in microvolts per root cycle at 1000 Hz (cycles per second). The direct current applied for noise measurement to the integrated circuit devices was 100 micro-amperes, as compared to the 6-8 milliamperes required for normal operation. After initial experimentation, the devices were caused to fail in a laboratory ambient environment, followed by an acceleration of the rate of electrolytic reaction through the use of essentially 100 percent relative humidity, versus the upper specification limit of 80 to 98% relative humidity.
X