Refine Your Search

Topic

Author

Search Results

Journal Article

The Potential for Fibre Alignment in the Manufacture of Polymer Composites from Recycled Carbon Fibre

2009-11-10
2009-01-3237
This paper studies the feasibility and potential benefits of aligning recycled carbon fibres, in the form of short individual filaments, to manufacture fibre reinforced polymer composites. A review of fibre alignment processes is presented to provide insight into the different alignment technologies. The main focus is on wet hydrodynamic processes, which offer a high degree of alignment for discontinuous fibres. The process parameters that govern the alignment efficiency are also reported. The effect of alignment on fibre packing efficiency in the manufacture of composites is included, together with a report of preliminary fibre alignment results obtained from three different alignment processes.
Journal Article

Emerging Technologies for Use in Aerospace Bonded Assemblies

2013-09-17
2013-01-2134
Several new technologies are now emerging to improve adhesive supply and formulation along with surface treatments that have the potential to offer significant improvements to both surface energy and cleanliness [3]. Additionally, the miniaturisation of laboratory techniques into portable equipment offers potential for online surface energy and chemical analysis measurement for use as quality control measures in a production environment. An overview of newly available technology is given here with several devices studied in further detail. Technologies assessed further in this paper are; portable surface contact angle measurement, ambient pressure plasma cleaning, portable FTIR measurement and adhesive mixing equipment. A number of potential applications are outlined for each device based on the operational technique. The practical aspects of implementation and the perceived technology readiness levels for operation, implementation and results are also given.
Journal Article

Technology Review of Thermal Forming Techniques for use in Composite Component Manufacture

2015-09-15
2015-01-2610
There is a growing demand for composites to be utilised in the production of large-scale components within the aerospace industry. In particular the demand to increase production rates indicates that traditional manual methods are no longer sufficient, and automated solutions must be sought. This typically leads to automated forming processes where there are a limited number of effective options. The need for forming typically arises from the inability of layup methods to produce complex geometries of structural components. This paper reviews the current state of the art in automated forming processes, their limitations and variables that affect performance in the production of large scale components. In particular the paper will focus on the application of force and heat within secondary forming processes. It will then review the effects of these variables against the structure of the required composite component and identify viability of the technology.
Journal Article

Application of Dynamic Phasor Concept in Modeling Aircraft Electrical Power Systems

2013-09-17
2013-01-2083
As future commercial aircraft incorporates more EMAs, the aircraft electrical power system architecture will become a complex electrical distribution system with increased numbers of power electronic converters (PEC) and electrical loads. The overall system performance and the power management for on-board electrical loads are therefore key issues that need to be addressed. In order to understand these issues and identify high pay-off technologies that would enable a major improvement of the overall system performance, it is necessary to study the aircraft EPS at the system level. Due to the switching behaviour of power electronic devices, it is very time-consuming and even impractical to simulate a large-scale EPS with some non-linear and time-varying models. The dynamic phasor (DP) technique is one way to solve that problem.
Journal Article

Flexible Tooling for Wing Box Rib Clamping and Drilling

2011-10-18
2011-01-2639
Currently the wing box rib assembly process requires the manual location and temporary fixing of components within product specific jig or fixtures for drilling. After drilling and reaming, parts are separated, cleaned, deburred prior to adding sealant, reclaiming and final bolting, but this may significantly increase cost, manufacturing lead-time, reduces flexibility and cannot usually be economically modified for use on other aircraft types. Due to potential increase in demand for the next generation single isle aircraft, existing tooling solutions have to be improved and new technologies have to be developed. This paper describes the development and testing of flexible tooling to provide clamping and support for drilling wing box ribs to mating rib posts within a restricted environment. Results are presented along with a discussion of the problems that may be encountered during clamping trials.
Journal Article

The Application of New Approaches to the Analysis of Deposits from the Jet Fuel Thermal Oxidation Tester (JFTOT)

2017-10-08
2017-01-2293
Studies of diesel system deposits continue to be the subject of interest and publications worldwide. The introduction of high pressure common rail systems resulting in high fuel temperatures in the system with the concomitant use of fuels of varying solubilizing ability (e.g. ULSD and FAME blends) have seen deposits formed at the tip of the injector and on various internal injector components. Though deposit control additives (DCAs) have been successfully deployed to mitigate the deposit formation, work is still required to understand the nature and composition of these deposits. The study of both tip and internal diesel injector deposits (IDID) has seen the development of a number of bench techniques in an attempt to mimic field injector deposits in the laboratory. One of the most used of these is the Jet Fuel Thermal Oxidation Tester or JFTOT (ASTM D3241).
Journal Article

Reconfigurable Assembly System Design Methodology: A Wing Assembly Case Study

2015-09-15
2015-01-2594
Current assembly systems that deal with large, complex structures present a number of challenges with regard to improving operational performance. Specifically, aerospace assembly systems comprise a vast array of interrelated elements interacting in a myriad of ways, resulting in a deeply complex process that requires a multi-disciplined team of engineers. The current approach to ramp-up production rate involves building additional main assembly fixtures which require large investment and lead times up to 24 months. Within Airbus Operations Ltd there is a requirement to improve the capacity and flexibility of assembly systems, thereby reducing non-recurring costs and time-to-market. Recent trends to improve manufacturing agility advocate Reconfigurable Assembly Systems (RAS) as a viable solution. Yet, adding reconfigurability to assembly systems further increases both the operational and design complexity.
Journal Article

Implementing Determinate Assembly for the Leading Edge Sub-Assembly of Aircraft Wing Manufacture

2014-09-16
2014-01-2252
The replacement for the current single-aisle aircraft will need to be manufactured at a rate significantly higher that of current production. One way that production rate can be increased is by reducing the processing time for assembly operations. This paper presents research that was applied to the build philosophy of the leading edge of a laminar flow European wing demonstrator. The paper describes the implementation of determinate assembly for the rib to bracket assembly interface. By optimising the diametric and the positional tolerances of the holes on the two bracket types and ribs, determinate assembly was successfully implemented. The bracket to rib interface is now secured with no tooling or post processes other than inserting and tightening the fastener. This will reduce the tooling costs and eliminates the need for local drilling, de-burring and re-assembly of the bracket to rib interface, reducing the cycle time of the operation.
Technical Paper

Regeneration in Aircraft Electrical Power Systems?

2008-11-11
2008-01-2898
This paper considers a wide range of options for the allowing regeneration onto the aircraft bus for possible inclusion in future aircraft power quality specifications. For many loads, such as actuators, the size and weight of power converters could be significantly reduced if the requirement to avoid regeneration was removed from the specifications.
Technical Paper

An Enhanced Secondary Control Approach for Voltage Restoration in the DC Distribution System

2016-09-20
2016-01-1985
The paper will deal with the problem of establishing a desirable power sharing in multi-feed electric power system for future more-electric aircraft (MEA) platforms. The MEA is one of the major trends in modern aerospace engineering aiming for reduction of the overall aircraft weight, operation cost and environmental impact. Electrical systems are employed to replace existing hydraulic, pneumatic and mechanical loads. Hence the onboard installed electrical power increases significantly and this results in challenges in the design of electrical power systems (EPS). One of the key paradigms for future MEA EPS architectures assumes high-voltage dc distribution with multiple sources, possibly of different physical nature, feeding the same bus(es). In our study we investigate control approaches to guarantee that the total electric load is shared between the sources in a desirable manner. A novel communication channel based secondary control method is proposed in this paper.
Technical Paper

Variation Aware Assembly Systems for Aircraft Wings

2016-09-27
2016-01-2106
Aircraft manufacturers desire to increase production to keep up with anticipated demand. To achieve this, the aerospace industry requires a significant increase in the manufacturing and assembly performance to reach required output levels. This work therefore introduces the Variation Aware Assembly (VAA) concept and identifies its suitability for implementation into aircraft wing assembly processes. The VAA system concept focuses on achieving assemblies towards the nominal dimensions, as opposed to traditional tooling methods that aim to achieve assemblies anywhere within the tolerance band. It enables control of the variation found in Key Characteristics (KC) that will allow for an increase in the assembly quality and product performance. The concept consists of utilizing metrology data from sources both before and during the assembly process, to precisely position parts using motion controllers.
Technical Paper

Integrated Design of Motor Drives Using Random Heuristic Optimization for Aerospace Applications

2017-09-19
2017-01-2030
High power density for aerospace motor drives is a key factor in the successful realization of the More Electric Aircraft (MEA) concept. An integrated system design approach offers optimization opportunities, which could lead to further improvements in power density. However this requires multi-disciplinary modelling and the handling of a complex optimization problem that is discrete and nonlinear in nature. This paper proposes a multi-level approach towards applying random heuristic optimization to the integrated motor design problem. Integrated optimizations are performed independently and sequentially at different levels assigned according to the 4-level modelling paradigm for electric systems. This paper also details a motor drive sizing procedure, which poses as the optimization problem to solve here. Finally, results comparing the proposed multi-level approach with a more traditional single-level approach is presented for a 2.5 kW actuator motor drive design.
Technical Paper

Fixturing and Tooling for Wing Assembly with Reconfigurable Datum System Pickup

2011-10-18
2011-01-2556
The aerospace manufacturing sector is continuously seeking automation due to increased demand for the next generation single-isle aircraft. In order to reduce weight and fuel consumption aircraft manufacturers have increasingly started to use more composites as part of the structure. The manufacture and assembly of composites poses different constraints and challenges compared to the more traditional aircraft build consisting of metal components. In order to overcome these problems and to achieve the desired production rate existing manufacturing technologies have to be improved. New technologies and build concepts have to be developed in order to achieve the rate and ramp up of production and cost saving. This paper investigates how to achieve the rib hole key characteristic (KC) in a composite wing box assembly process. When the rib hole KC is out of tolerances, possibly, the KC can be achieved by imposing it by means of adjustable tooling and fixturing elements.
Technical Paper

Review of Reconfigurable Assembly Systems Technologies for Cost Effective Wing Structure Assembly

2013-09-17
2013-01-2336
Airbus commercial wings are assembled manually in dedicated steel structures. The lead time to design, manufacture and commission these fixtures is often in excess of 24 months. Due to the nature of these fixtures, manufacturing is slow in responding to changes in demand. There is underused capacity in some areas and insufficient ramp-up speed where increased production rate is needed. Reconfigurable Manufacturing Systems and Reconfigurable Assembly Systems (RAS) provide an approach to system design that provides appropriate capacity when needed. The aim of the paper is to review RAS technologies that are suitable for cost-effective wing structure assembly and what knowledge gaps exist for a RAS to be achieved. The paper examines successful cases of RAS and reviews relevant system design approaches. Cost savings are acknowledged and tabularised where demonstrated in research. The research gaps to realising a RAS for wing assembly are identified and different approaches are considered.
Technical Paper

Impact of Soft Magnetic Ageing on the Performance of Aerospace Propulsion Machines

2022-03-08
2022-01-0050
Electric machines in aerospace applications are subjected to extremely high operating temperatures. This increases coercivity or decreases saturation flux density of the electrical steel resulting in increased core loss. The need for high power density and increased operating speed favours the use of thin gauge Silicon Steel (Si-Fe) and Cobalt Iron (Co-Fe) laminations for aerospace applications. Therefore, the variation in iron loss is studied for three grades of Si-Fe laminations by subjecting them to controlled ageing in laboratory. The analysis is also provided over a range of flux density and frequency to generalize the phenomenon over the operating domain. The results of ageing the laminations are in turn used to predict the degradation in performance of a 1.15 MW, 16-pole 48-slot propulsion machine for aerospace application. The degradation is estimated in terms of variation in iron loss.
Technical Paper

Audit of Fuel Utilisation During the Warm-Up of SI Engines

1997-05-01
971656
Experimental studies of fuel utilisation during the early stages of engine warm-up after cold-starts are reported. The investigation has been carried out on a 1.81, 4 cylinder spark-ignition engine with port electronic fuel injection. The relationship between fuel supplied and fuel accounted for by the analysis of exhaust gas composition shows that a significant mass of fuel supplied is temporarily stored or permanently lost. An interpretation of data is made which allows time-dependent variations of these to be separately resolved and estimates of fuel quantities made. The data covers a range of cold-start conditions down to -5°C at which, on a per cylinder basis, fuel stored peaks typically at around 0.75g and a total of 1g is returned over 100 seconds of engine running. Fuel lost past the piston typically accounts for 2g over 200 to 300 seconds of running.
Technical Paper

Application of Dynamic Phasors for Modeling of Active Front-End Converter for More-Electric Aircraft

2012-10-22
2012-01-2157
The paper deals with the development of active front-end rectifier model based on dynamic phasors concept. The model addresses the functional modeling level as defined by the multi-layer modeling paradigm and is suitable for accelerated simulation studies of the electric power systems under normal, unbalanced and line fault conditions. The performance and effectiveness of the developed model have been demonstrated by comparison against time-domain models in three-phase and synchronous space-vector representations. The experimental verification of the dynamic phasor model is also reported. The prime purpose of the model is for the simulation studies of more-electric aircraft power architectures at system level; however it can be directly applied for simulation study of any other electrical power system interfacing with active front-end rectifiers.
Technical Paper

Modeling of An 18-pulse Autotransformer Rectifier Unit with Dynamic Phasors

2012-10-22
2012-01-2159
The more-electric aircraft (MEA) is the major trend for airplanes in the next generation. Comparing with traditional airplanes, a significant increase of on-board electrical and electronic devices in MEAs has been recognized and resulted in new challenges for electrical power system (EPS) designers. The design of EPS essentially involves in extensive simulation work in order to ensure the availability, stability and performance of the EPS under all possible operation conditions. Due to the switching behavior of power electronic devices, it is very time-consuming and even impractical to simulate a large-scale EPS with some non-linear and time-varying models. The functional models in the dq0 frame have shown great performance under balanced conditions but these models become very time-consuming under unbalanced conditions, due to the second harmonics in d and q axes. The dynamic phasor (DP) technique has been proposed to solve that problem.
Technical Paper

Practical Implementation and Associated Challenges of Integrated Torque Limiter

2022-03-08
2022-01-0038
Evolving of aircraft design towards further electrification requires safe and fault-free operation of all the components. More electric aircraft are increasingly utilizing electro-mechanical actuators (EMA). EMAs are prone to jamming and subsequent failure due to large forces on the shaft. Large forces are generated due to the high reflected inertia of the electric machine rotor. To limit the force acting on the shaft, a torque limiting device is connected to the power train which can separate the rotating mass of the electric machine from the power train. In this paper, a concept of integration of torque limiter and the electric machine rotor is presented to reduce overall volume and mass. It is connected closely with the rotor, within the motor envelope. A commercially available torque limiter and an electric machine designed for actuator application are used to demonstrate the concept. While essential for safety, the torque limiter adds to the mass and size of the overall EMA.
Technical Paper

The Influence of Gas/Fuel Ratio on Combustion Stability and Misfire Limits of Spark Ignition Engines

2000-03-06
2000-01-1208
The deterioration of combustion stability as lean operating limits and misfire conditions are approached has been investigated experimentally. The study has been carried out on spark ignition engines with port fuel injection and four-valves-per-cylinder. Test conditions cover fully-warm and cold operation, and ranges of air/fuel ratio, exhaust gas recirculation rates and spark timing. An approximate method of calculating gas/fuel ratio is described. This is used to show that combustion stability, characterised by the coefficient of variation of i.m.e.p., is a function of calculated gas/fuel ratio and spark timing until near to the limit of stability. A rapid deterioration in stability and the onset of weak, partial burning occurs at a gas/fuel ratio between 24:1 and 26:1 under fully-warm operating conditions, and around one gas/fuel ratio lower under cold operating conditions.
X