Refine Your Search

Search Results

Viewing 1 to 12 of 12
Standard

CRANE AND CABLE EXCAVATOR BASIC OPERATING CONTROL ARRANGEMENTS

1977-03-01
HISTORICAL
J983_197703
This SAE Recommended Practice applies to mobile, construction type, crane and cable excavator band and foot controls. It should not be construed to limit the use of, or to apply to combination controls, automatic controls, or any other special operating control requirements.
Standard

Crane and Cable Excavator Basic Operating Control Arrangements

1998-10-01
CURRENT
J983_199810
This SAE Recommended Practice applies to mobile, construction type, crane and cable excavator hand and foot controls. It should not be construed to limit the use of, or to apply to combination controls, automatic controls, or any other special operating control requirements.
Standard

Crane Boomstop

2017-10-09
CURRENT
J220_201710
This SAE Recommended Practice applies to the boomstop for the main boom of all mobile construction type cranes having rope supported booms, equipped for hook work, clamshell, magnet, grapple, or concrete bucket attachments.
Standard

Crane Boomstop

2012-02-06
HISTORICAL
J220_201202
This SAE Recommended Practice applies to the boomstop for the main boom of all mobile construction type cranes having rope supported booms, equipped for hook work, clamshell, magnet, grapple, or concrete bucket attachments.
Standard

Telescopic Boom Length Indicating System

2012-05-02
HISTORICAL
J1180_201205
This SAE Recommended Practice applies to mobile cranes when used in lifting crane service which are equipped with boom length indicating devices.
Standard

Telescopic Boom Length Indicating System

2019-02-15
CURRENT
J1180_201902
This SAE Recommended Practice applies to mobile cranes when used in lifting crane service which are equipped with boom length indicating devices.
Standard

Crane Boom Hoist Disengaging Device

2021-09-20
CURRENT
J999_202109
This SAE Standard applies to cranes which are equipped to adjust the boom angle by hoisting and lowering means through rope reeving.
Standard

Crane Boom Hoist Disengaging Device

2011-08-04
HISTORICAL
J999_201108
This SAE Standard applies to cranes which are equipped to adjust the boom angle by hoisting and lowering means through rope reeving.
Standard

Cranes--Access and Egress

2022-10-19
WIP
J2703
This recommended practice specifies criteria for steps, stairways, ladders, walkways, platforms, handrails, handholds, guardrails and entrance openings which permit access to and from operator, inspection or maintenance platforms on mobile cranes parked in accordance with the manufacturer's instruction. It also presents requirements for guards and restraints as related to moving parts.
Standard

Cranes—Access and Egress

2008-10-27
CURRENT
J2703_200810
This recommended practice specifies criteria for steps, stairways, ladders, walkways, platforms, handrails, handholds, guardrails and entrance openings which permit access to and from operator, inspection or maintenance platforms on mobile cranes parked in accordance with the manufacturer’s instruction. It also presents requirements for guards and restraints as related to moving parts.
Standard

Nomenclature and Dimensions for Crane Shovels

2012-02-06
CURRENT
J958_201202
This SAE Standard includes names of major components and parts peculiar to this type of equipment. The illustrations are not intended to show all existing commercial machines or to be exactly descriptive of any particular machine. They have been selected to depict principles used in identifying specific mechanisms and to identify useful dimensional relationships.
Standard

Lifting Crane Sheave and Drum Sizes

2021-10-21
CURRENT
J881_202110
This SAE Standard covers minimum dimensional relationship for sheaves, drums, and wire rope for mobile, construction type lift cranes.
X